Click on the image to see an enlarged view. (JPG, 434 kb)
Summer 2005 - Sidewalk, ADA ramps, and brick accents near Overbrook Road. The St. Pius X School crossing shifted about 40 feet northward at this location.
Click on the image to see an enlarged view. (JPG, 434 kb)
Summer 2005 - New bus stop along York Road in front of the York Road Plaza, opposite the Drumcastle Center. The new bus stop is ADA-accessible.
Click on the image to see an enlarged view. (JPG, 289 kb)
Summer 2005 - Streetscape work in progress near the site for the new Eckerd Pharmacy. The SHA contractor's work in this area includes new sidewalk, brick accents, and the reconstruction of the signal at the York Road/Walker Avenue/Gittings Avenue intersection.
Click on the image to see an enlarged view. (JPG, 492 kb)
Summer 2005 - Work in progress along southbound York Road near Lake Avenue. The work includes the placement of the new concrete "bus pad", sidewalk and drainage work, and the reconstruction of the Lake Avenue signal.
Click on the image to see an enlarged view. (JPG, 711 kb)
Summer 2005 - "The Home Stretch": Excavation work along southbound York Road between Lake Avenue and Northern Parkway.
Click on the image to see an enlarged view. (JPG, 570 kb)
Spring 2005 - New sidewalk with brick accents in the commercial area near Stevenson Lane.
Click on the image to see an enlarged view. (JPG, 505 kb)
Spring 2005 - New sidewalk with grass "buffer" area to separate pedestrians from vehicular traffic.
Click on the image to see an enlarged view. (JPG, 502 kb)
Spring 2005 - New street furniture near Regester Avenue.
Click on the image to see an enlarged view. (JPG, 429 kb)
Spring 2005 - New sidewalk, brick accents, and pedestrian lighting along southbound York Road near Regester Avenue.
Click on the image to see an enlarged view. (JPG, 52.3 kb)
Winter 2005: Pouring the new sidewalk along southbound at Dumbarton Road.
Click on the image to see an enlarged view. (JPG, 55.5 kb)
Winter 2005: Pouring the new driveway aprons at Bradford Bank, north of Regester Avenue.
Click on the image to see an enlarged view. (JPG, 54.5 kb)
Winter 2005: Sidewalk excavation and new pedestrian lighting between Murdock Road and Dunkirk Road.
Click on the image to see an enlarged view. (JPG, 51.2 kb)
Winter 2005: Roadway and sidewalk excavation near Overbrook Road in front of St. Pius X Church.
Click on the image to see an enlarged view. (JPG, 53.8 kb)
Winter 2005: Roadway and sidewalk excavation near Overbrook Road in front of St. Pius X Church.
Click on the image to see an enlarged view. (JPG, 77.96 kb)
December 2004: New landscaping in the median between York Road and the frontage road in Stoneleigh. Red oaks will be added during the spring planting season.
Click on the image to see an enlarged view. (JPG, 68.6 kb)
December 2004: Stone veneer planter wall, brick accents, and landscaping next to five new parallel parking spaces in front of Uncle Wiggly's and Purdum Pharmacy. Zelkova trees line York Road between Regester Avenue and Stoneleigh Road.
Click on the image to see an enlarged view. (JPG, 68 kb)
December 2004: Zelkova trees line York Road between Regester Avenue and Stoneleigh Road.
Click on the image to see an enlarged view. (JPG, 75 kb)
December 2004: A blend of dense yews and Zelkova trees along the 6700 block of York Road.
Click on the image to see an enlarged view. (JPG, 84.7 kb)
December 2004: New sidewalk along northbound York Road near the City line. Brick accents will be added in the coming weeks.
Click on the image to see an enlarged view. (JPG, 74.4 kb)
December 2004: Out with the old, in with the new. New "cobra-head" traffic safety lighting along northbound York Road in Baltimore City. (The old fixtures - located in the sidewalk - were removed after this photo was taken.)
Click on the image to see an enlarged view. (JPG, 69.9 kb)
Early October 2004 : New brick-accented plaza in front of the Anneslie Shopping Center.
Click on the image to see an enlarged view. (JPG, 67.3 kb)
Early October 2004 : New sidewalk, brick accents, and pedestrian lighting in front of the Stone York Plaza. Recently the plaza got a facelift; note the new awning installed by the owner and patio seating in front of Lou’s Bagel Cafe. “Green Vase” Zelkova trees will be planted in this area.
Click on the image to see an enlarged view. (JPG, 73.6 kb)
Early October 2004 : Stone veneer planter walls and new stairway near Purdum Pharmacy. Brick accents, benches, and plantings still to come.
Click on the image to see an enlarged view. (JPG, 77.1 kb)
Early October 2004: Another view of the planter walls and stairs at Purdum Pharmacy. An ADA-compliant walkway “wraps around” the planter wall near the rear parking lot.
Click on the image to see an enlarged view. (JPG, 68.4 kb)
Early October 2004: The new “median” between York Road and the parking area for the shops in the 6900 block. The steep slope is replaced with a stone veneer retaining wall, and the parking lot is expanded to add five parking spaces. A pedestrian refuge area is also provided at the Regester Avenue intersection. When the brick work is complete, plantings will follow.
Click on the image to see an enlarged view. (JPG, 72.5 kb)
Early October 2004 : New sidewalk, brick accents, and ADA-compliant parking (and ramp) near Uncle Wiggly’s. The streetscape improvements, coupled with the renovations to the First and St. Stephens Church, provided a fine setting for the National Night Out in August.
Click on the image to see an enlarged view. (JPG, 73.1 kb)
Early October 2004 : Sidewalk and brick accents in front of Harry Little’s. Also pictured: The new signal at Regester Avenue.
Click on the image to see an enlarged view. (JPG, 65 kb)
August 2004: Reconstruction of the Stoneleigh commercial area with new drainage system; new sidewalk, curb and gutter; ADA-compatible sidewalk ramps; brick work; new pedestrian lighting; and base course resurfacing of the service road.
Click on the image to see an enlarged view. (JPG, 65.8 kb)
August 2004: Reconstruction of the Anneslie commercial area with new underground drainage system; new sidewalk, curb and gutter; ADA-compatible sidewalk ramps; brick work; and new pedestrian lighting. Construction work includes the new traffic signal at the intersection of York Road and Regester Avenue.
Click on the image to see an enlarged view. (JPG, 67.7 kb)
Late August 2004: Northbound York Road at Dunkirk Road: Reconstruction of the Anneslie commercial area with new underground drainage system; new sidewalk, curb and gutter; ADA-compatible sidewalk ramps; brick work; pedestrian lighting. Construction work included the new traffic signal at the Dunkirk Road intersection.
Click on the image to see an enlarged view. (JPG, 59.5 kb)
Late August 2004: View along York Road at Murdock Road: Reconstruction along York Road at the Anneslie commercial area included: new drainage system along northbound York Road; reconstruction of the pedestrian plaza with new sidewalk, curb and gutter; ADA-compatible sidewalk ramps; brick work; pedestrian lighting.
Click on the image to see an enlarged view. (JPG, 66 kb)
Late August 2004: Close-up view of Anneslie commercial area with reconstructed pedestrian plaza and brick work. New landscaping will be placed in brick-encased areas.
Click on the image to see an enlarged view. (JPG, 139 kb)
Summer 2004: Northbound York Road at Dunkirk Road - new traffic signal, curb and gutter.
Click on the image to see an enlarged view. (JPG, 129.7 kb)
Summer 2004: Northbound York Road north of Dunkirk Road - new pedestrian plaza, sidewalk with brick accents.
Click on the image to see an enlarged view. (JPG, 129.7 kb)
Summer 2004: Looking south at Regester Avenue - new traffic signal, curb and gutter, and reconstruction of Stoneleigh service road.
Click on the image to see an enlarged view. (JPG, 129.1 kb)
Summer 2004: Northbound York Road at Anneslie Road - new curb, gutter and sidewalk .
Click on the image to see an enlarged view. (JPG, 132.8 kb)
Summer 2004: Northbound York Road at Murdock Road - new curb, gutter, and sidewalk .
Click on the image to see an enlarged view. (JPG, 63.7 kb)
Northbound York Road at Regester Avenue.
Click on the image to see an enlarged view. (JPG, 78.4 kb)
Looking south along the service road in Stoneleigh.
Click on the image to see an enlarged view. (JPG, 44.5 kb)
Northbound Work Zone at Anneslie Road.
Click on the image to see an enlarged view. (JPG, 42 kb)
Pedestrian plaza in Anneslie.
Click on the image to see an enlarged view. (JPG, 51.4 kb)
Service Road in Stoneleigh.
Click on the image to see an enlarged view. (JPG, 47 kb)
Intersection of York Road and Stevenson Lane.
Click on the image to see an enlarged view. (JPG, 71 kb)
Northbound York Road - Grading and removal of old curb, gutter, and sidewalk in Anneslie.
Click on the image to see an enlarged view. (JPG, 92 kb)
Looking south from shopping area in Anneslie.