Training Exercises
Introduction :: Introduction to SCEA | Exercise 1
Module 1 :: Resource Definition | Exercise 1 | Exercise 2
Module 2 :: Geographic Boundary | Exercise 1 | Exercise 2
Module 3 :: Timeframes | Exercise 1 | Exercise 2
Module 4 :: Land Use Timeframes | Exercise 1 | Exercise 2
Module 5 :: Drawing SCEA Conclusions | Exercise 1 | Exercise 2
Module 6 :: Presentation of SCEA in the Environmental Documentation | Exercise 1
Module 5 :: Exercise 2
SCEA Conclusions
You are currently preparing a Draft Environmental Impact Statement (DEIS) for a proposed highway improvement project. The alternatives retained for detailed engineering and environmental analysis include the following:
A NoBuild Alternative
An upgrade of the existing highway
A bypass of the existing highway
Please answer the questions below as True or False. Then print this page with your answers and click on the link to the answers page.
Answers | Back to Top
All content contained within these materials is the intellectual property of Maryland State Highway Administration.
© 2000 Maryland State Highway Administration.
Last modified: Friday September 15, 2000.
|