Contractor's Inquiry Responses

Contract No. BA8475171


Inq. 312 Post Date:   4/2/2003 Inquiry Date:   4/1/2003
  Q. In inquiry No. 271, a contractor requested how access would be provided through the Williams property. SHA's response was that it would be the contractor's responsibility to coordinate this access with A.V. Williams and that they would be responsible for all environmental impacts. This non-response was questioned in inquiry No. 293. The SHA's response was that they would address this by addendum. The addendum showed the point of access but did not address the crucial issues. The Contractor cannot force Williams to do anything. The cost for this access cannot be determined since there are no plans. An environmental permit is needed. We are not sure if one can be obtained. This access is for stage one work. The permit process will take months and months after an agreement with Williams is reached. We suggest that if the state wishes to proceed without addressing this crucial issue, that the State address these cost and time issues by excluding this from our bid and providing a change order for these yet unknown costs and considerations.
  A. A Right of Entry has been secured by SHA with AV Williams for access to the Williams property for the construction of MD 43. An addendum was issued to show the location of the access point onto the Williams property. The location of the access/haul road will need to be coordinated between AV Williams and the Contractor. Please keep in mind that an access/haul road can be built in this location without environmental impacts. The environmental boundaries can be obtained on the Existing Conditions Development Plan. Copies of the Existing Conditions Development Plan is public information and was filed with Baltimore County last year. If the access/haul road does impact any wetlands, the contractor will be responsible for any mitigation required for these impacts and SHA will not be held responsible for delays associated with the impacts.

Inq. 311 Post Date:   4/2/2003 Inquiry Date:   3/28/2003
  Q. Add 7 provides for an option of 24" ductile iron pipe in lieu of 48" HDPE pipe for the Baltimore County sewer relocation. The selection is to be the contractors' option. However, after the bid the county and the SHA will decide which pipe is to be used for the relocation. This may negate the contractors's choice and we believe result in an unfair bidding practice. If a choice is to be made after the bid then one of the pipe selections should be the base and the other an alternate. As a utility contractor we are not yet convinced that the HDPE at excessive depths is the appropriate material.
  A. This issue has been addressed in the addendum 9.

Inq. 310 Post Date:   3/28/2003 Inquiry Date:   3/15/2003
  Q. What is bid item 8042 used for?
  A. Bid this item as shown in the schedule of prices.

Inq. 309 Post Date:   3/28/2003 Inquiry Date:   3/15/2003
  Q. What is the scope of work for bid item 7082? -To what depth is it placed?
  A. Bid this item as shown in the schedule of prices.

Inq. 308 Post Date:   3/28/2003 Inquiry Date:   3/15/2003
  Q. What is the location where bid item 5001 is utilized?
  A. The note on sheet 98 regarding the temporary pavement for Ramp A refers to the pavement detail titled "Temporary Road for MD 43 and US 40", which utilizes this item.

Inq. 307 Post Date:   3/28/2003 Inquiry Date:   3/15/2003
  Q. How will rock excavation be paid for on this project if it is encountered?
  A. See Standard Specifications for Construction and Materials Section 201.04.

Inq. 306 Post Date:   3/28/2003 Inquiry Date:   3/15/2003
  Q. On sheet 306 note 2 (relocate parts and equipment to new storage pad) How is contractor paid for this item? Do you have a list as to what must be relocated?
  A. The equipment shall be relocated to the storage pad by MARC. The contractor is not responsible for this item.

Inq. 305 Post Date:   3/28/2003 Inquiry Date:   3/15/2003
  Q. Can bid item 2004 stay on site in fill areas outside the structure area of roadway or must it be hauled off site?
  A. Item 2004 is Class 1-A Excavation. This is defined as unsuitable material below the lowest limits of excavation. Please see Section 208.03.01 "Removal and Replacement of Unsuitable Material".

Inq. 304 Post Date:   3/28/2003 Inquiry Date:   3/15/2003
  Q. What is bid item 1024 used for?
  A. Modifying Existing Overhead Sign #6 (refer to sheet 125 (TP30 of 30).

Inq. 303 Post Date:   3/28/2003 Inquiry Date:   3/15/2003
  Q. What are bid items 1016 & 1017 -Are they taper end sections for temporary barrier?
  A. Refer to sheet 98 (TP03 of 30), the last note under "Notes".

Inq. 302 Post Date:   3/28/2003 Inquiry Date:   3/21/2003
  Q. Also, the quantity for Item #5010 (HMA F.D. Patch) of 120 sy should be greater than for Item #5022 (PCC Type 1 Repairs) of 140 sy since the HMA permanent must be cut back by 2 feet as per pavement details.
  A. Item 5022 was calculated for CY not SY as shown in the schedule of prices. An addendum has been issued to correct this item unit of measurement

Inq. 301 Post Date:   3/28/2003 Inquiry Date:   3/21/2003
  Q. What if the quantity of the 15" quantity increases in the field relative to the 9" quantity?
  A. Changes in quantity of 15" or 9" should not matter since the item is measures by CY

Inq. 300 Post Date:   3/28/2003 Inquiry Date:   3/21/2003
  Q. There are two different concrete repair depth (9" & 15") as identified in the pavement legend on sheet 13 of the plans. Will both depths (9" & 15") be paid under the same item ?
  A. Yes

Inq. 299 Post Date:   3/28/2003 Inquiry Date:   3/21/2003
  Q. Please clarify method of payment for full depth and partial depth patching along with the concrete patching repairs (Type 1). Is my assumption correct that the HMA portion of the P.D. & F.D. composite patching will be paid under Item #5010& 5011, while the concrete portion of the composite patching will be paid under Item #5022 (PCC Permanent repairs Type 1)?
  A. Yes

Inq. 298 Post Date:   3/25/2003 Inquiry Date:   3/19/2003
  Q. Addendum No. 7 changed the chart "Division of Work and Materials" on plan sheet 674 for item 2 "Installation of 644 anchor and 644 Strand assembly" under the columns of Materials and Fabrication" to be done by the contractor. There is still some confusion among our vendors concerning the "Guy Strand Assembly" shown on ET010 in the bill of materials and on ET022. Are the "Guy strand Assembly" to be supplied on this contract and if so how many? We are told that AMTRAK normally supplies these and not the contractor; Please clarify. Please consider providing a list of particular materials to be supplied for this contract so that there is no question what is to be supplied.
  A. As stated previously, the Contractor will supply all those items listed under the Structural Steel Material section of the Master Bill of Material on Sheet No. 697 (ET-025). Item no. 54 is for Guy Anchor Type B-1. In Addendum No. 7, the quantity was increased from 8 each to 12 each. The details for Guy Anchor B-1 are on Sheet No. 694 (ET 022). This anchor consists of a reinforced concrete footing with a guy sleeve cast into it. Typically, the fabricators precast this guy anchor as one unit. Amtrak will supply the Guy Strand Assembly (GSA4).

Inq. 297 Post Date:   3/25/2003 Inquiry Date:   3/24/2003
  Q. Item no. 3112 is apparently to be used for the 12" pipe at the railroad yard, but the item specifies 12" corrugated aluminum pipe and the detail on page 316.22 shows a 12" perforated subdrain encased with stone and wrapped with filter cloth. Is the stone and filter cloth paid for separately or as part of Item 3112?Please see Special Provision 800 - Railroad Construction. Measurement and Payment for Ballasted Track Construction.
  A. See Special Provision 800 - Railroad Construction. Measurement and Payment for Ballasted Track Construction.

Inq. 296 Post Date:   3/25/2003 Inquiry Date:   3/24/2003
  Q. There is no item to pay for the 12" underdrain that is the outfall for SWM Pond #5. How is this pipe paid for and what type material is to be used?
  A. Underdrain and underdrain outlet is part of the Square Yard price as specified on page 98 for Bioretention Facility. Underdrain and underdrain outlet will be in accordance with M 252 as specified on page 340.

Inq. 295 Post Date:   3/24/2003 Inquiry Date:   3/17/2003
  Q. On plan sheet 256 - Total cut = 29000 c.y. cut to fill =17500 c.y. What happens to the balance of the earthwork = 29000 -17500 11500 c.y.?
  A. The use of this extra material is at the contractors discretion.

Inq. 294 Post Date:   3/24/2003 Inquiry Date:   3/14/2003
  Q. 8152 -12" PVC sewer line? Where is this item shown on drawings?
  A. Please see contractors inquiries: Inquiry #260

Inq. 293 Post Date:   3/24/2003 Inquiry Date:   3/14/2003
  Q. 8151 -3/4" water service? -Where on drawings?
  A. Please refer to Parking Lot and Baltimore County Water Line plans

Inq. 292 Post Date:   3/24/2003 Inquiry Date:   3/14/2003
  Q. 8150 -3/4" Meter setting? Where on drawings?
  A. Please see contractors inquiries: Inquiry #225

Inq. 291 Post Date:   3/24/2003 Inquiry Date:   3/14/2003
  Q. 8149 -6" sewer house conn. (is this the sanitary sewer for relocated trailer in parking lot)?
  A. Please see contractors inquiries: Inquiry #225

Inq. 290 Post Date:   3/24/2003 Inquiry Date:   3/14/2003
  Q. 8057 -Is the domestic water piping shown on plan sheet 316.27 the only item that pertains to this item?
  A. Please see contractors inquiries: Inquiry #257

Inq. 289 Post Date:   3/24/2003 Inquiry Date:   3/14/2003
  Q. The way the specs are written I am confused on the following bid items: What is the scope of work associated with each item: 8048 - Is the 48" wide sewer relocation the only item this pertains to (plan sheet 756.4).
  A. This should be clarified in addendum 7

Inq. 288 Post Date:   3/24/2003 Inquiry Date:   3/14/2003
  Q. We have been told by some of the demolition sub-contractors that some of the dwellings scheduled for demo on this contract have asbestos on them. Will you take care of asbestos removal prior to us doing the demo? Have the houses been surveyed for asbestos? Since the houses are still occupied, how are we to gain access for asbestos? There are no special provision specs on this demo- It could also require air monitoring.
  A. The removal of asbestos will be handled by the State before the demolition by the contractor

Inq. 287 Post Date:   3/24/2003 Inquiry Date:   3/14/2003
  Q. Ref. Inq. #15 2/27/2003 - says item 8152 is to connect inspection pit to sewer line on MD 150. When I look at this drawing I see 6" PVC to inspection pit yet your bid item is 12"PVC- please clarify.
  A. This has been addressed by Pen and Ink change in addendum 7

Inq. 286 Post Date:   3/24/2003 Inquiry Date:   3/18/2003
  Q. Without having two (2) bid items for item 8048 one for DIP and one for HDPE how does the contractor know which to bid if Baltimore County has the right to request one or the other?
  A. The contractor should bid the item knowing Baltimore County can choose either material after bid opening.

Inq. 285 Post Date:   3/24/2003 Inquiry Date:   3/18/2003
  Q. Ref trench in earth detail shown on plan sheet 756.4, is the 2' of the material above the pipe existing excavated material? The balance of the backfill in the standard detail shows central back fill yet the specs call for flowable fill -Please clarify.
  A. Please clarify what special provisions call for flowable fill.

Inq. 284 Post Date:   3/24/2003 Inquiry Date:   3/18/2003
  Q. If the DIP pipe is selected does it require the same #6 aggregate envelope as the HDPE pipe (page 756.4 - detail trench in earth)?
  A. From the special provision included Addendum 7, if 42" Locking Ring-Type Restrained Joint Ductile Iron pipe material is selected, any references on the contract Plans to 48" High Density Polyethylene pipe should be interpreted as 42" Locking Ring-Type Restrained Joint Ductile Iron pipe. The plans and details will remain the same for either material.

Inq. 283 Post Date:   3/24/2003 Inquiry Date:   3/18/2003
  Q. Ref. Add #7 revised page 287N -Is flowable fill incidental to the lump sum item 8048 or is it paid under the flowable fill item?
  A. Please refer to measurement and payment of this item in the special provision included in addendum 7

Inq. 282 Post Date:   3/24/2003 Inquiry Date:   3/19/2003
  Q. Typical section on S6-40 Page 479 shows stamped concrete for the raised media. The details do not show this. Which is correct?
  A. The raised median will not have stamped concrete.

Inq. 281 Post Date:   3/20/2003 Inquiry Date:   3/3/2003
  Q. What type of switch point protector is required for the turnouts?
  A. Sufficient information is provided in the contract documents to determine the type of switch point protector required.

Inq. 280 Post Date:   3/20/2003 Inquiry Date:   3/6/2003
  Q. Referencing the conduits for the parking lot lighting system (print #62) and the street lighting system (print #s 716-717), what size is the conduit to be and under which bid item is the conduit placement paid?
  A. For the parking lot lighting system (sheet 62), the legend and notes indicate which conduit is 1", 2" or 3" Sch. 40 or 4" Sch. 80 PVC. The remaining cable is to be direct bury duct cable.

Inq. 279 Post Date:   3/20/2003 Inquiry Date:   3/17/2003
  Q. Item 3025 - Changed quantity in description but not schedule of prices sheets. Which quantity is correct?
  A. The letter is correct. The schedule of prices sheet will be revised by Addendum

Inq. 278 Post Date:   3/19/2003 Inquiry Date:   3/17/2003
  Q. The response that SHA has posted to Contractor Inquiry #271 on the web site about access to the project through the A.V. Williams property is unreasonable. This contractor has talked to the Administrator of A.V. Williams property, every week, for at least six weeks and have been unable to get any information about where the State will be allowed access to this property. The administrator indicates that they do not even have drawings for the development of the site yet. Without the tools that the State possesses, such as condemnation and eminent domain, it is impossible for a contractor to force the A.V. Williams estate to provide access to the project. The State should acquire the access to the A.V. Williams property and provide bidders with plans allowing the access from public property to the job site. For this reason we again request that the State provide details about contractor access to the A.V. Williams property. This will be addressed by addendum
  A. The response that SHA has posted to Contractor Inquiry #271 on the web site about access to the project through the A.V. Williams property is unreasonable. This contractor has talked to the Administrator of A.V. Williams property, every week, for at least six weeks and have been unable to get any information about where the State will be allowed access to this property. The administrator indicates that they do not even have drawings for the development of the site yet. Without the tools that the State possesses, such as condemnation and eminent domain, it is impossible for a contractor to force the A.V. Williams estate to provide access to the project. The State should acquire the access to the A.V. Williams property and provide bidders with plans allowing the access from public property to the job site. For this reason we again request that the State provide details about contractor access to the A.V. Williams property. This will be addressed by addendum.

Inq. 277 Post Date:   3/19/2003 Inquiry Date:   3/4/2003
  Q. Item 8068 Remove signs from existing overhead structure indicates 160 sq.ft. Is this quantity correct? Plan sheet 719 indicates a 16 x 10 (160 sq. ft.) and a 17 x 8 (136 sq.ft), sheet 720 indicates a 17 x 6 (102 sq.ft.) plus the signs being removed on sheets 736 and 737 addressed above.
  A. Please bid item as shown in the schedule of prices

Inq. 276 Post Date:   3/19/2003 Inquiry Date:   3/4/2003
  Q. Plan Sheet No. 736 & 7372. Sheets indicate several signs to be relocated - how is this paid?
  A. Please bid item as shown in the schedule of prices

Inq. 275 Post Date:   3/19/2003 Inquiry Date:   3/4/2003
  Q. Plan Sheet No. 736 & 737 Sheets indicate signs to be removed from cantilever sign structures. Are the cantilevers to be removed? How is this to be paid?
  A. Please refer to plan sheet 704 for removal of this item

Inq. 274 Post Date:   3/19/2003 Inquiry Date:   3/4/2003
  Q. Note 15 - Please provide a detail of exactly what the 12" x 12" x 4'-5" deep sump is or is it a typo?
  A. This is a typographical error that will be corrected with a pen and ink change by addendum.

Inq. 273 Post Date:   3/19/2003 Inquiry Date:   3/4/2003
  Q. Notes 4, 5 and 6 refer to service entrance upgrade to be by BGE installed underground. Is the contractor responsible for any conduit and wiring required to feed the 1200 Amp MDP? Ordinarily BGE feeds to a CT cabinet and the contractor is responsible for conduit and wiring from the CT cabinet to the service equipment (MDP). If the contractor is responsible for the conduit and wiring please provide details of conduits and wire sizes required.
  A. Contractor is responsible for all coordination with BGE. All information and instructions from BGE utility representative shall be transmitted through the contractor. The work shall be done in accordance with BGE requirements. Contractor shall be responsible for all coordination, associated work and costs.

Inq. 272 Post Date:   3/19/2003 Inquiry Date:   3/4/2003
  Q. Note 19 - The car stand plug panel is indicated as 200 amp which is consistent with the breaker size and wire size, however the specification indicates a 400 amp rated unit. Is the 400 amp unit in fact required? Also the specification indicates that cord assemblies be provided with the units - please specify what length cords are required. We also request that mounting/pad details be provided for these units.
  A. The car stand should plug panels should be 200 amps. The cord lengths should be 25'. As per manufacturers instructions.

Inq. 271 Post Date:   3/19/2003 Inquiry Date:   3/4/2003
  Q. The existing a well as the new main distribution panel indicate that they are 3 phase 4 wire. I believe the system may only be 3 phase 3 wire as note 12 refers to a new transformer that is 480V-480/277 secondary. This would mean we have a 480V dclta to 480/277 Y. This would also explain note 13 where Panel HP1 is indicated as being 480/277 volt. This also pertains to note 19 - the card stand plugs. This note indicates 480V 3 phase 4 wire. According to note 16 the 4th wire is a ground. We assume that again the 4th wire referred to is a ground and not a neutral. Please confirm.
  A. The incoming service panel is a 480 volt 3 phase 4 wire with ground as the 4th wire.

Inq. 270 Post Date:   3/19/2003 Inquiry Date:   3/13/2003
  Q. There are no measurement and payment special provisions for bid item No. 8048, "BALTIMORE COUNTY SEWER RELOCATION". The Contractors Inquiry website indicates that this item is for 48" HDPE Sewer Relocation shown on Plan Sheet 756.4. Are the manholes incidental to item No. 8048 or paid for under Bid Item No. 8025, 'PRECAST SANTIARY SEWER MANYHOLE"? Is the abandonment of the existing 42" sanitary sewer by filling with flowable fill incidental to Item No. 8048 or paid for under bid Item No. 3103, "FLOWABLE FILL"?
  A. This has been addressed in addendum 7

Inq. 269 Post Date:   3/19/2003 Inquiry Date:   3/12/2003
  Q. Ref. structure S-8-1 shown on page 132 of the plans. - How is this structure paid for?
  A. Please see Addendum 2, Item 3101.

Inq. 268 Post Date:   3/19/2003 Inquiry Date:   3/12/2003
  Q. Where is the plan view for SWM facility #14 found for the surface sand filter measurements?See sheet No. 316.7a
  A. Where is the plan view for SWM facility #14 found for the surface sand filter measurements?See sheet No. 316.7a

Inq. 267 Post Date:   3/19/2003 Inquiry Date:   3/12/2003
  Q. Does bio-ret facility 4 shown on plan sheet 131 get any cleanouts?
  A. Bioretention Facility 4 includes cleanouts as shown on Sheet 132.

Inq. 266 Post Date:   3/19/2003 Inquiry Date:   3/12/2003
  Q. Ref. Addendum no. 2 note on sheet 54 of 777 at bottom left of spec says see sheet 767 for connection to 12" main. That connection is not shown on 767.Please review plans sheet 767, Addendum 2. This connection is shown.
  A. Ref. Addendum no. 2 note on sheet 54 of 777 at bottom left of spec says see sheet 767 for connection to 12" main. That connection is not shown on 767.Please review plans sheet 767, Addendum 2. This connection is shown.

Inq. 265 Post Date:   3/19/2003 Inquiry Date:   3/12/2003
  Q. Where are the specs. on the building demo found?
  A. Please refer to the Standard Specifications for Construction and Material, Section 102 - Removal and Disposal of Existing Buildings.

Inq. 264 Post Date:   3/19/2003 Inquiry Date:   3/12/2003
  Q. You have two (2) bid items for hot mix patching (5010 & 5011) both bid by the square yard- on plan sheet 13 different details are shown (i.e. Ext. MD 43 Mainline full depth patch & MD 150 shoulder full depth patch). How does the contractor determine which detail we will be required to perform?
  A. Addressed in addendum 7

Inq. 263 Post Date:   3/19/2003 Inquiry Date:   3/12/2003
  Q. Reference plan sheet 756.2 Note #8 -Which is the pay item for monitoring the 36" diameter force main?Please refer to special provision "Protection of Existing Structures" on page 80A of the IFB.
  A. Reference plan sheet 756.2 Note #8 -Which is the pay item for monitoring the 36" diameter force main?Please refer to special provision "Protection of Existing Structures" on page 80A of the IFB.

Inq. 262 Post Date:   3/19/2003 Inquiry Date:   3/11/2003
  Q. Contract Plan Sheet No. 316.23 specifies the chain railing posts to be spaced at 4'-0" C/C. Contract Plan sheet No. 316.24 Section B-B specifies the posts to be a 6'-0" CTRS. What is the correct spacing of posts to be used for chain railing at the inspection pit?
  A. This will be addressed by addendum

Inq. 261 Post Date:   3/19/2003 Inquiry Date:   3/6/2003
  Q. Will the SHA require the Training on the RWIS, or will the manuals be sufficient?
  A. Manuals will be sufficient

Inq. 260 Post Date:   3/19/2003 Inquiry Date:   3/12/2003
  Q. Line Item #8098 calls for a Comm. Interface T-1 Mux/Demux. Can you provide specs on this item?
  A. Specifications will not be provided. Please bid as shown in the contract documents

Inq. 259 Post Date:   3/19/2003 Inquiry Date:   3/6/2003
  Q. Line Item #8072, 2" Sch 80 PVC Bored. After reviewing the contract documents we can not find any conduit associated with this item. Please advise. Please bid as shown in the schedule of prices.
  A. Line Item #8072, 2" Sch 80 PVC Bored. After reviewing the contract documents we can not find any conduit associated with this item. Please advise. Please bid as shown in the schedule of prices.

Inq. 258 Post Date:   3/14/2003 Inquiry Date:   3/12/2003
  Q. Our takeoff for CL 3 excavation on structures 6, 8 and 9 is significantly different from the line item. Will you check these quantities/
  A. Please bid items as shown in the schedule of prices

Inq. 257 Post Date:   3/14/2003 Inquiry Date:   3/10/2003
  Q. For bid items 1002 and 1033, can both office trailers be set up at the same location, or do they have to be placed in separate locations?
  A. The same location

Inq. 256 Post Date:   3/14/2003 Inquiry Date:   3/10/2003
  Q. On page 63 in phase one, it says that Windless Run and the triple 84" pipe will be accessed by way of AV Williams property under right of entry. Can you provide a drawing showing where his access will be provided and what the contractor will be required to do to provide this access? This question has been asked previously with no response, we're not sure how you can bid this job fairly without the answer.
  A. The contractor is responsible to coordinate this access with AV Williams. SHA will not provide the location of the access. Please keep in mind that the contractor is responsible for any additional environmental impacts associated with temporary access roads not included in the plans by SHA.

Inq. 255 Post Date:   3/14/2003 Inquiry Date:   3/12/2003
  Q. Is the channel excavation at Structure 5 incidental to the class 2 rip rap or will a CL 5 excavation item be established?
  A. This will clarified with a pen and ink change by addendum

Inq. 254 Post Date:   3/14/2003 Inquiry Date:   3/14/2003
  Q. There are not Track cross sections for Track D & E beyond track A Sta. 117+00. Is it the intent that the railroad ballast will be level to top of tie between tracks for all tracks where access road are not present?
  A. Tracks D & E are existing tracks beyond the station indicated above. Existing ballast is present to the top of tie at these locations. Additional ballast is not required in the area between the tracks.

Inq. 253 Post Date:   3/14/2003 Inquiry Date:   3/14/2003
  Q. How many spikes are required per tie, Tangent track as well as curved track?
  A. Refer to Railroad Construction Specification, Ballasted Track Construction, and in particular the reference to AREMA Specifications.

Inq. 252 Post Date:   3/14/2003 Inquiry Date:   3/14/2003
  Q. After doing a ballasted track quantity take off and pulling out the footage for the turnouts and the pit direct fixation track it appears that Bid item 8059 quantity of 4,000 Track Feet is incorrect. Could you please review this quantity?
  A. Bid item as shown in the schedule of prices.

Inq. 251 Post Date:   3/14/2003 Inquiry Date:   3/12/2003
  Q. Are gauge rods required with new track construction?
  A. Yes, for all curves in excess of 12-degrees as specified.

Inq. 250 Post Date:   3/14/2003 Inquiry Date:   3/14/2003
  Q. Relay rail sometimes has no records of ultrasonic testing. If no records exist for the relay 115 RE rail must we perform our own testing?
  A. If no prior ultrasonic testing records exist for 115 RE relay rail, the contractor must perform the testing.

Inq. 249 Post Date:   3/14/2003 Inquiry Date:   3/12/2003
  Q. How many anchors are required for the turnouts?
  A. Refer to Railroad Construction Specification, Ballasted Track Construction, and in particular the reference to AREMA Specifications, Page 5-4-7, paragraph i.

Inq. 248 Post Date:   3/14/2003 Inquiry Date:   3/14/2003
  Q. What is the rail anchor pattern for the track construction?
  A. Refer to Railroad Construction Specification, Ballasted Track Construction, and in particular the reference to AREMA Specifications, Page 5-4-7, paragraph j.

Inq. 247 Post Date:   3/14/2003 Inquiry Date:   3/12/2003
  Q. If the entire 25' width roadway is constructed with a slip form paver, will a longitudinal joint be required at the center of the pour or between the (2) 11' lanes?
  A. A sawcut longitudinal joint with tie-bars is required between the two lanes.

Inq. 246 Post Date:   3/14/2003 Inquiry Date:   3/14/2003
  Q. If a slip form paver is used to construct the 25' width concrete pavement, will a longitudinal joint be required between the 11' lane and the effective 3' shoulder?
  A. No, the 25' mainline width should be paved as two slabs wide, one 11' wide for the fast lane and one 14' wide for the slow lane and shoulder combined.

Inq. 245 Post Date:   3/14/2003 Inquiry Date:   3/14/2003
  Q. In reference to bid Item No. 8152, "12 INCH POLYVINYL CHLORIDE SEWER LINE", in the question and answer part of the website you have implied that this item is for the PVC pipe from the trench drains and out falling to existing sanitary manhole (see Plan Sheet 316.6). The PVC pipe called for on the plans is 6" in diameter. Please either revise the pay item description or the pipe diameter on the plan sheet.
  A. The pipe diameter on the plan sheet will be changed by pen and ink by addendum

Inq. 244 Post Date:   3/14/2003 Inquiry Date:   3/12/2003
  Q. Is Bid Item No. 3112, "12 INCH CORRUGATED ALUMINUM, 14 GAUGE", for the 12" Perforated CMP Subdrain in the Rail Yard? Note that the specification reference is 303, no 306.
  A. Yes, that is correct.

Inq. 243 Post Date:   3/14/2003 Inquiry Date:   3/14/2003
  Q. Is Bid Item No. 8048, "BALTIMORE COUNTY SEWER RELOCATION", for the 48" HDPE Sewer Relocation shown on Plant Sheet No. 756.4? If not, what is this bid item for?, and what pay item covers the sewer relocation shown on Plan Sheet No. 756.4?
  A. Yes.

Inq. 242 Post Date:   3/14/2003 Inquiry Date:   3/14/2003
  Q. Is bid Item no. 8057, "WATER DISTRIBUTION SYSTEM", and SPECIAL PROVISIONS pages 313A-313J, for the water pipe shown on Plan Sheet No. 316.27? If not, what is this bid item for?, and what pay item covers the water pipe shown on Plan Sheet No. 316.27?
  A. The Bid item no. 8057 Water Distribution System is the payment for the water pipes to be installed in the Yard and it is described in SP sited.

Inq. 241 Post Date:   3/14/2003 Inquiry Date:   3/14/2003
  Q. Add. No. 4 added plan sheets 756.1 thru 756.4 showing sewer force main monitoring, 48" gravity sewer relocation, new 72" manholes and abandonment of the existing sewer. There was no description of the work in the addendum nor were there any pay items created for the work.
  A. The sewer force main monitoring description can be found in SP Protection of Existing Structures on page 80A of the IFB. The pay item for the 48" gravity sewer relocation is Item 8048 - Baltimore County Sewer Relocation - LS. Clarification of the measurement and payment for this item will be addressed by addendum

Inq. 240 Post Date:   3/14/2003 Inquiry Date:   3/12/2003
  Q. Item 8152- 12" PVC Sewer has a quantity of 540LF. Only 310 LF can be found on the plans.
  A. Clarification of this item will come from a pen and ink change which will be issued by addendum

Inq. 239 Post Date:   3/14/2003 Inquiry Date:   3/14/2003
  Q. Bid items 8048 and 8057 appear to cover no work shown on the plans or explained in TE Contract documents. These items are: 8048- Baltimore County Sewer relocation - L.S. 8057- Baltimore County Water Distribution System -L.S. Other Bid Items cover the work. What are these two items for?
  A. Item 8048 - Baltimore County Sewer Relocation - L.S.. This item is for 48" gravity sewer relocation. Item 8057 - Baltimore County Water Distribution System - L.S.. This item is described as "Water Distribution System" and can be found in the track relocation plans and is described in the Special Provision on page 313A.

Inq. 238 Post Date:   3/14/2003 Inquiry Date:   3/14/2003
  Q. What are the lengths of 12" underdrain in regard to end caps, tee elbows, etc.
  A. There is no 12" underdrain in the contract. Please clarify question.

Inq. 237 Post Date:   3/13/2003 Inquiry Date:   3/13/2003
  Q. Contract Plan Sheet No. 316.26 shows a proposed concrete storage pad. How is this item paid?
  A. The concrete storage pad is paid for under Mix No. 3 Concrete for Miscellaneous structures.

Inq. 236 Post Date:   3/13/2003 Inquiry Date:   3/12/2003
  Q. How is the raised median and sidewalk on the S-8 structure paid for? You have items for S-6, S-7 and S-9.
  A. A. Please refer to Item 4009 - CONCRETE FOR SIDEWALKS AND RAISED MEDIAN ON S8

Inq. 235 Post Date:   3/13/2003 Inquiry Date:   3/13/2003
  Q. Reference sheet 287 B of the specs. -Fire hydrant relocation says we are to install a new hydrant not relocate the existing hydrant so why is the bid item relocate hydrant? Reference sheet 287 for the backfill of new water main is all backfill to be select borrow or flowable fill? Can excavated material be used for backfill.
  A. The relocation is a set back from the original position which includes extending the existing lead and installing a new hydrant. We have separated the backfill (other than native) out of the bid price for the pipe. Only native soil placed and compacted will be included in the bid price for the pipe. There are separate bid items for select borrow and flowable fill when used. The backfill issue is being addressed as a part of an addendum

Inq. 234 Post Date:   3/13/2003 Inquiry Date:   3/13/2003
  Q. On proposal page 433 you have two items for 5018 - are they both supposed to be in the pricing proposal
  A. This item has been corrected in addendum 6

Inq. 233 Post Date:   3/13/2003 Inquiry Date:   3/12/2003
  Q. Where does bid item 3112 - 12" corr alum pipe get used on the project
  A. The 12" Corrugated Aluminum Pipe is used for the subdrain for the track structure

Inq. 232 Post Date:   3/13/2003 Inquiry Date:   3/13/2003
  Q. What is the scope of work associated with bid item 3018 temporary crossing.
  A. Item 3018 Temporary Crossing relates to Sheet WM 5 and the Temporary Access Culvert referenced on that sheet and on Detail 36 on Sheet WM 8. A large drainage swale separates Area 'E' and Area 'F'. It is anticipated that flows through this swale can be expected during the construction of the site and thus a temporary crossing will be needed. The temporary crossing will be installed prior to any access into area 'F' and will be removed at the approval of the Engineer.

Inq. 231 Post Date:   3/13/2003 Inquiry Date:   3/12/2003
  Q. Will you be changing the asphalt clause on page 181 before the bid date
  A. No

Inq. 230 Post Date:   3/13/2003 Inquiry Date:   3/13/2003
  Q. In order to figure the amount of geotextile fabric req'd for bid item 2006 we need to know the depth that you will be placing bid item
  A. Please refer to Section 211 - Geosynthetic Stabilizated Subgrade Using Graded Aggregate Base in the Standard Specifications for Construction and Materials.

Inq. 229 Post Date:   3/13/2003 Inquiry Date:   3/12/2003
  Q. What are the pay items for the domestic water piping shown on Plan Sheet No. 316.27?
  A. The pay item for this work is Item 8057 - Water Distribution System

Inq. 228 Post Date:   3/13/2003 Inquiry Date:   3/13/2003
  Q. What are the pay items for the 48" HDPE Sewer Relocation shown on Plan Sheet No. 756.4?
  A. The pay item for this work is Item 8048 - Baltimore County Sewer Relocation

Inq. 227 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. Amscot Structural is presently estimating the above-mentioned project. We would appreciate clarification on the type of steel for the internal steel shims within the Elastomeric bearing pads. We just want to verify that the steel shims are stainless steel per the details. On the last job the specifications indicated carbon steel A-570 gr. 36 & the drawing indicated stainless steel. Reference drawing number S4-26 or 394 of 777 for bridge number 3216 on MD Rte. 43 westbound. Revised bid date is the 3/6/03.
  A. All the Elastomeric bearings in this project will have stainless steel shims.

Inq. 226 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. What is item 3109 for? Item 3109 - Mix 3 Concrete for Miscellaneous structures - 975 cy.
  A. The concrete storage pad is paid for under as Mix No. 3 Concrete for Miscellaneous structures.

Inq. 225 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. There are two items with the same item number - Item 5018
  A. This has been corrected in addendum 6

Inq. 224 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. On the Rail Yard plans there is a Concrete Storage Pad. How is this paid for? Also, how is the access road on the Rail Yard Plans paid for?
  A. The concrete storage pad is paid for under as Mix No. 3 Concrete for Miscellaneous structures. The access road is paid for under item no 5002, 5007, and 5018.

Inq. 223 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. Would you revise the Grading table to reflect the changes in Addendum no. 4?
  A. Bid quantities as shown in the schedule of prices. A revised grading table will be provided by Redline to the contractor awarded the project.

Inq. 222 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. The Wage rates (General Decision No. MD01001) provided in the Contract Special Provisions do not establish a pay rate for the classification of Painters. The following bridges required painting: S-1, S-2, S-3, and S-9. Can this classification be provided?
  A. As per the Contract Provision Prevailing Wage Instructions for the Contractor, under General Requirements (I), "Contractors employing a classification of worker for which a wage rate was not included on the original wage decision, must submit, to the Wage and Hour Team, a request for an additional classification and rate prior to the employee's employment at the project."

Inq. 221 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. Note No. 1 on Contract Plan Sheet No. 348 refers to Section D-D on Sheet S2-9. Sheet S2-9 does not provide Section D-D. Can the Section D-D be provided?
  A. This will be clarified in Addendum No. 7.

Inq. 220 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. On January 23, 2003, I ask a question concerning clarification on exactly what materials are required to be supplied for bid item 4011 "Fabricated Structure Steel for Electric Traction modification for 59"; to date I don't think this has been clarified. Our vendors for this material are equally confused; especially with the guy anchor and guy strand assembly. The chart on ET-002 shows these materials to be supplied by Amtrak yet the vendors say this is normally supplied by them. At least one vendor has contacted Amtrak and has been told that the number of guy anchors shown in the plans is incorrect 12 ea vs 8 ea. I again ask all materials required to be supplied by the contractor for this bid item
  A. The materials and fabrication of the guy anchor and guy strand assembly will be provided by the Contractor. These changes will be addressed by addendum.

Inq. 219 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. There are no typical pavement sections for the access road to be built at the MARC rail relocation. Sheet 316.22 of 777 in Detail 1 for railroad crossings provides the following section: 2" Wearing Surface 8" Ballast 5" Base Course 6" Sub-Ballast Sheet 316.24 of 777 in Section B-B for the inspection pit provides the following section: 2" Asphalt Wearing Surface 12" Ballast 5" Course Base 8" Sub-Ballast Which section should be used to build the road? Do these two sections apply only to the railroad crossings and inspection pit respectively? If the access road requires either section, what type of HMA mixes will be used for the surface and the base courses?
  A. Addressed in Addendum 4. See sheet 316.22 of 777

Inq. 218 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. How will you pay for the modified B-72 headwall with improved entrance (S 8-2)? How will you pay for the special hanging baffle type energy dissipater (S 8-3)?
  A. An item for modified B-72 headwall was added by Addendum 4. As stated in the January 2001 Standards Specifications for Construction and Materials, the hanging baffle energy dissipater will be paid under Mix 2 Concrete for Miscellaneous Structures. Item 3025 will be revised by Addendum.

Inq. 217 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. Please address the following questions pertaining to the bioretention facilities: The typical section on plan sheet 132, shows an aggregate filter over the entire pond bottom. The special provisions describe the aggregate blanket as 3 feet wide following the underdrain. Which is correct? Refer to the previous questions; if the special provisions are correct, then the BSM depth is incorrect as stated in the table on plan sheet 132. Please show the geotextile installation on the typical section plan sheet 132.
  A. This will be addressed by addendum

Inq. 216 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. How did you arrive at your quantity for bid item 3087 clay backfill for core trench -It appears that this is used at SWM 3, 6, 8, 9, 10 only and based info you show this quantity you have does not appear correct.
  A. Item 3087 was addressed in addendum 5

Inq. 215 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. Will you provide a method of payment for the perimeter dike/swales shown on plan sheets 219 and 220?
  A. An item for Perimeter Dike/Swale will be added by Addendum.

Inq. 214 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. On Page 23 of the contract specs., the % of work within 50' of the railroad track is not filled.
  A. This issue will be addressed by Addendum.

Inq. 213 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. Will you provide a detail and a method of payment for the diversion ditches shown in the initial phase of the Erosion and Sediments Control Plan?
  A. There is a detail for Diversion Ditch on Sheet 193. As stated in the detail, the proposed ditches will be used as diversion ditches. Since the diversion ditches are ultimate proposed ditches they are paid for as Class 2 Excavation

Inq. 212 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. Do you know what permits the contractor will have to obtain for trailer relocation and new trailer installation (ticket office). What will the fees be? Do you have contact person the contractor can talk to, to obtain this information?
  A. Since fees vary, we recommend the contractor contact Mr. Doug Swam 410-887-4455 and/or Ms. Chris Rorke 410-887-3321 of Baltimore County Permits and Development Management for the most up to date information concerning permits, insurance and charges. In addition, new electric and telephone services will need to be supplied to the new trailer location. The contractor will be required to obtain a Baltimore County electric permit.

Inq. 211 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. Can more specifics be provided concerning the electrical systems to be installed for the MARC railroad relocation? Which items from the Schedule of Prices correspond to the materials and construction notes found on sheet 316.30 of 777?
  A. See Category 800 - Electrical Methods and Materials - General Requirements for Electrical Methods and Materials. The items that correspond to the electrical system are as follows: Item No. 800000: Ductbank, Conduit and Wire Item No. 800000: Electrical Plug Stand Item No. 800000: Lighting System Item No. 800000: Panelboard System

Inq. 210 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. On Page 223 B under measurement and payment-it states water and sanitary lines from the trailer to the existing source will be measured and paid under pertinent utility item - which pay items would this be?
  A. Item 8149 - 6" SEWER HOUSE CONNECTION Item 8150 - ¾" COPPER WATER SERVICE

Inq. 209 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. Item 5006 is deleted from the schedule of prices in the contract book, however the deletion of the item in not made mention in any of he addendums so far (addendums 1-5). Please let me know the resolution to this problem as soon as possible.
  A. The schedule of prices is correct. The deletion of this item will be addressed by addendum.

Inq. 208 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. On page 63 in phase one, it says that Windless Run and the triple 84" pipe will be accessed by way of AV Williams property under right of entry. Can you provide a drawing showing where his access will be provided and what the contractor will be required to do to provide this access?
  A. The contractor is responsible to coordinate this access with AV Williams. SHA will not provide the location of the access. Please keep in mind that the contractor is responsible for any additional environmental impacts associated with temporary access roads not included in the plans by SHA.

Inq. 207 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. Will the contractor be allowed to move materials for drainage including pipe, stone, rip rap and drainage structures along the roads mentioned above?
  A. No. As stated in the Contract Documents.

Inq. 206 Post Date:   3/12/2003 Inquiry Date:   3/12/2003
  Q. In the sequence of construction, page 62 it says that the construction will not be allowed to access secondary county roads for haul roads with certain exceptions. Will the contractor be allowed to haul materials needed to construct the White Marsh Run Bridge east abutment Bird River Bridge, Windless Run Bridge and the Amtrak Bridge along a route including Ebenezer Road, Vincent Road, Middle River Road and bird River Road? These materials include stone, re-bar, concrete forms and concrete beams.
  A. Yes. As stated in the Notice to Contractor Sequence of Construction, the contractor is not allowed to access the secondary county roads for haul roads during construction with the exception of mobilizing equipment and materials to construct: the east abutment and pier at White Marsh Run, Bird River Road Bridge, east abutment of Windless Run and the west abutment for the Amtrak Bridge.

Inq. 205 Post Date:   3/7/2003 Inquiry Date:   3/7/2003
  Q. It still appears that is bid item 3029 for 18" RCP is over estimated 9083LF vs. 9415LF.
  A. Bid the item as it is.

Inq. 204 Post Date:   3/7/2003 Inquiry Date:   3/6/2003
  Q. Bid Item 3037 27" x 42" RCP-Where is the 175LF of pipe found? All we can find is I 15-5 to EW 15-6 30LF
  A. Sheet 190 was revised by Addendum 4 to add 145 LF of 27x42 ERCP from EP-22-18 to EP-22-19.

Inq. 203 Post Date:   3/7/2003 Inquiry Date:   3/7/2003
  Q. Ref. Plan sheet 316.28A Detail 1Valve Pit. Does the check valve act as the backflow preventer in this detail or is there an actual backflow preventer req'd - if so, what are the specs on it?
  A. Check valve shown on the referenced detail is a part of backflow preventer assembly. Specification for this item is described in Category 800, "Water distribution. General requirements for water distribution".

Inq. 202 Post Date:   3/7/2003 Inquiry Date:   3/7/2003
  Q. Where does bid item 5006 - H/M s/P 19.0mm for base PG 64-28 Level 1 get used?
  A. This item has been revised in addendum 4

Inq. 201 Post Date:   3/7/2003 Inquiry Date:   3/7/2003
  Q. What typical pavement sections does the paving in the MD 43 Rail Yard follow?
  A. This item has been revised in addendum 4

Inq. 200 Post Date:   3/7/2003 Inquiry Date:   3/6/2003
  Q. On drawing 316.20 the 6" thick bank run cover that is shown - under what pay item will this be paid?
  A. This was addressed in Addendum 3. Item number 120540 Bank Run Gravel Subbase for Maintenance of Traffic.

Inq. 199 Post Date:   3/7/2003 Inquiry Date:   3/7/2003
  Q. On drawing 138 of 777 - Riser structure and pond drain schematic. If lower PVC line is 48 LF it is impossible for upper 6" reverse pipe to be 23 LF - Please clarify.
  A. Sheets 136 and 138 will be revised by addendum 6.

Inq. 198 Post Date:   3/7/2003 Inquiry Date:   3/6/2003
  Q. Ref. Plan Sheet 95 - Ramp A and MD 43 STA. 335+00 - 359+00 - Phase 1A - if temp signals are req'd how will they be paid for?
  A. For the sequence of signal installation at the intersection of Ramp A and MD 43, the note on sheet 107 refers the Contractor to the signal plans, in particular sheet 703.

Inq. 197 Post Date:   3/7/2003 Inquiry Date:   3/7/2003
  Q. Referencing specification page 287B pertaining to flowable fill material for backfill on water mains located in paving. Can a separate bid item be added to cover the cost of this material?
  A. This will be addressed by addendum

Inq. 196 Post Date:   3/7/2003 Inquiry Date:   3/7/2003
  Q. Referencing specifications page 287B pertaining to select fill material for backfill on water mains located in the medians. Can a separate bid item be added to cover the cost of the material?
  A. We have separated the backfill (other than native) out of the bid price for the pipe. Only native soil placed and compacted will be included in the bid price for the pipe. There are separate bid items for select borrow and flowable fill when used.

Inq. 195 Post Date:   3/7/2003 Inquiry Date:   3/6/2003
  Q. Referencing structure I 20-3, there is no profile shown. What is the top elevation?
  A. I-20-3 is renamed I-19-19 (Sta 235+84, 59.9' Lt.). The Structure Schedule on sheet 191 will be revised by Addendum 4 to agree with PS-19 (sheet 45), PP-18 (sheet 182) and the Pipe Schedule on DS-7 (sheet 191).

Inq. 194 Post Date:   3/7/2003 Inquiry Date:   3/7/2003
  Q. Referencing structure MH 20-1, there is no profile shown and the plan shows this as a doghouse manhole. What is the size of the existing pipe? What is the top elevation? What is the invert elevation?
  A. The Pipe Schedule on Sheet 191 indicates that MH-20-1 is on an existing 18"RCP. The Structure Schedule on Sheet 191 was revised by Addendum 4.

Inq. 193 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. 2/14/03 Item 8007 calls for square aluminum poles but the plan sheets call for round tapered. Which is correct?
  A. Provide square poles in the parking lot as described in the Special Provision for Section 808.

Inq. 192 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. Bridge bonding for 29 - permanent and temporary at protective shielding How is this item paid for? Who furnishes the material (+matl list) Who installs?
  A. Sheet 674 in the Plans has a chart indicating that Amtrak forces will do the bonding and grounding work, however the Contractor is responsible for furnishing and installing the Concrete Inserts in the parapets as shown in the Electric Traction plans. The Concrete Inserts are included in the Concrete Parapet item, as described in the revision to Section 420 - Portland Cement Concrete Structures, issued in Addendum No. 3.

Inq. 191 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. Bid item 4151 was added by addendum No.3 for protection of existing structures. The special provision on pages 80A thru 80C do not provide any parameters for this bid item. Please provide information for maximum vibration limits allowed and distance from operation that would be applicable to this bid item. The special provision as written is pretty wide open. Please clarify the intent as to what structures other than the sewer line is to be included in this bid item.
  A. The maximum vibration limits and the distance from the operation that this item applies to shall be determined by the Contractor's seismologist. Other structures, such as houses, that may need protection will also be determined by the Contractor's seismologist.

Inq. 190 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. Bid Item 4123 "CHAIN LINK SAFETY FENCE FOR BRIDGE - TYPE II FOR S10" is for the fence on top of the moment slab/parapet portion of the retaining wall S10; Approx. 180 LF. What bid item is the ground mounted 6' HIGH CHAIN LINK FENCE directly behind the coping portion (Type II Retaining Wall) Approx. 411 LF paid under; Please clarify.
  A. The ground mounted fence is paid for under the 6 FOOT GALVANIZED CHAIN LINK FENCE item.

Inq. 189 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. Bid Items 4006, 4007, and 4008 Clean Out of Miscellaneous Drainage Structures. Q: Piers for S1, S2 & S3 show an embedded coast iron downspout, are there embedded downspouts in all the columns as shown; there is no evidence of an outlet end near the ground level on several of these? Were the existing downspouts filled previously under a prior contract? Are these downspouts required to be flushed prior to filling with concrete? Can grout or some other material be used instead of Mix 6 Concrete for filling downspouts? Please clarify all of above.
  A. Refer to the existing bridge plans for the details of the existing embedded downspouts. These downspouts have not been filled previously. Addendum No. 5 will address requirements for flushing and filling the downspouts.

Inq. 188 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. 3. Bridge S2 (3363) Drawing S2-6 Detail - Modification to Expansion Joints @ Piers. Are new Steel Parapet Plates at Pier 2 only?
  A. There are roadway joints at both piers so both will have steel parapet plates.

Inq. 187 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. Bridge S2 (3363) Drawing S2-6 Detail - Modification to Expansion Joints @ Piers. Replace existing compression seals. What are the Units of Replacement?
  A. We do not understand this question.

Inq. 186 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. Bid Items 4081 and 4085 are to place a Concrete Overlay after the removal of the existing conrete median barrier for 51 & 53. The width of the overlay is 4 feet. Can these areas be tine finished in lieu of mechanical grooving?
  A. Tining is not acceptable for bridge decks.

Inq. 185 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. Addendum No. 3 - Revised Category 400 to permit the use of Silica Fume Concrete for Bridge Deck Overlay on 51, 52 & 53. Materials, construction procedures and curing methods and time are different for Silica Fume Concrete compared to Latex Modified Concrete. There are no Standard Specifications or Special Provisions for Silica Fume Concrete when use for Bridge Deck Overlays. Please provide Specification/Special Provision for the Silica Fume Concrete Overlay.
  A. Addendum No. 3 included a Special Provision for Silica Fume Concrete for Bridge Deck Overlay.

Inq. 184 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. Item 5018 - Increased quantity in description, there are two 5018 bid items in bid item sheets with different descriptions. Are these correct, or are the two items to be combined?
  A. The letter is correct. There is only one item 5018. The Schedule of Prices sheet will be revised by Addendum

Inq. 183 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. Item 5017 - Changed quantity in description but not in bid item sheets. Which quantity is correct?
  A. The letter is correct. The Schedule of Prices sheet will be revised by Addendum

Inq. 182 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. Item 4028 Does the aluminum barrier extend 2' past the last post as the details show or does the fence come up to the last post as shown on the bridge elevation?
  A. The limits of the Electrified Railroad Protective Barrier are as shown on Sheet 595.

Inq. 181 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. Item 4005 - I can not find the type or schedule for the 6" PVC conduit under the bridges. Also, we need the required spacing for the conduit expansion joints.
  A. The type and schedule of the 6" PVC pipe will be included in Addendum No. 5. As stated previously, the locations of the expansion joints are shown on Sheet 618.

Inq. 180 Post Date:   3/6/2003 Inquiry Date:   3/6/2003
  Q. 1. Drawing S9-44 has compression seal joint details where form seals are specified.
  A. The Compression Seal Joint and Retaining Angle Detail is for both elastomeric and foam seals. The seal sizes that were added in Addendum No. 3 are for foam seals.

Inq. 179 Post Date:   2/27/2003 Inquiry Date:   2/27/2003
  Q. Is the quantity for Item 3109 - Mix 3 correct? 975 cubic yards is a very large quantity.
  A. This will be addressed by addendum

Inq. 178 Post Date:   2/27/2003 Inquiry Date:   2/26/2003
  Q. How are paid for geotextile under the GASB for structure S-11?
  A. The payment of the geotextile under the GASB for structure S-11 is incidental to the GASB payment item

Inq. 177 Post Date:   2/27/2003 Inquiry Date:   2/27/2003
  Q. Structure S-11 at the upstream headwall the invert difference between the center pipe and the two outside pipes is 1.5', at the downsteam headwall the difference between the pipe is 1', is this correct?
  A. Yes, this is correct

Inq. 176 Post Date:   2/27/2003 Inquiry Date:   2/26/2003
  Q. Where is item 8048 - Baltimore County Sewer Relocation used?
  A. This is addressed in Addendum 4

Inq. 175 Post Date:   2/27/2003 Inquiry Date:   2/26/2003
  Q. Where is Item 8152 - 540' of PVC Sewer used?
  A. Item 8152 - 540' of PVC Sewer is used to connect the inspection pit to the sewer line on MD 150. See sheet 316.6.

Inq. 174 Post Date:   2/27/2003 Inquiry Date:   2/27/2003
  Q. Storm Water Management Pond #14 at the rail yard requires a sand filter, underdrain aggregate, 6" perforated pipe, 6" solid pipe and 8" solid pipe to be used as a dewatering device, where are these items paid for?
  A. This was addressed in Addendum 4

Inq. 173 Post Date:   2/27/2003 Inquiry Date:   2/27/2003
  Q. How are you paid for the "6" thick Bank Run Gravel as ground cover" shown on sheet 316.12 and 316.20 added by addenda 3? What are the limits of the 6" thick Bank Run Gravel?
  A. This was addressed in Addendum 3. Item number 1038 Bank Run Gravel Subbase for Maintenance of Traffic. The Limits of the Bank Run Gravel are as shown on Sheet No. 316.11, 316.17, 316.18, & 316.19.

Inq. 172 Post Date:   2/27/2003 Inquiry Date:   2/27/2003
  Q. How is the proposed concrete storage pad at the rail yard to be paid for?
  A. The proposed concrete storage pad is paid for under item 3109 Mix 3 Concrete

Inq. 171 Post Date:   2/27/2003 Inquiry Date:   2/26/2003
  Q. Referencing plan sheet 316.6, the drawing shows 540 linear feet of 6" PVC sewer connecting to a proposed trench drain. What bid item or items is this work paid under?
  A. This item is paid for under Item No. 8152. Note, in addendum 3 it has been changed to 12- inch polyvinyl chloride sewer line.

Inq. 170 Post Date:   2/27/2003 Inquiry Date:   2/26/2003
  Q. What type of material is to be used for the joint sealing of portland cement concrete pavements?
  A. The joint sealing shall conform to Section 523 JOINT SEALING OF PORTLAND CEMENT CONCRETE PAVEMENTS. The specific material sections for joint sealers are Section 911.01 JOINT SEALER AND CRACK FILLER or 911.01.01 Silicone Joint Sealer and Crack Filler. Please note that the contractor has some options regarding selection of joint sealing material provided that the material meets the appropriate specifications.

Inq. 169 Post Date:   2/26/2003 Inquiry Date:   2/27/2003
  Q. Information requested concerning line bid item: Item No. 7050 - 463 each of MEDIAN PLANTING Has this been addressed by addendum as to where information concerning it can be found within the project special provisions and/or project plans.
  A. This item has been removed as part of Addendum 4

Inq. 168 Post Date:   2/26/2003 Inquiry Date:   2/27/2003
  Q. Q. In reference to Bid Items 7083, PLACING SALVAGED TOPSOIL FOR GRADING ADJUSTMENT, at 2,000 CY and 7086, PLACING FURNISHED TOPSOIL FOR GRADING ADJUSTMENT, at 15,000 SY, can you please information on where the topsoil is to be placed? Are these items for the topsoil in the wetland mitigation ponds?
  A. The 15,000 S.Y. of furnished topsoil for grading adjustments will be placed within the graded portions of the wetland mitigation site or ponds as the contractor refers to them

Inq. 167 Post Date:   2/26/2003 Inquiry Date:   2/27/2003
  Q. What items of work are specifically included in Bid Item 3007, STORMWATER MANAGEMENT CONTROL STRUCTURE FOR S.W.M. POND NO.3?
  A. "SP 305 - Miscellaneous Structures" includes provisions for payment of Stormwater Management Control Structures. This SP was revised by Addendum No. 2 to include the cost of temporary modifications for sediment basin risers as incidental to the cost of the Stormwater Management Control Structure (305.04.07).

Inq. 166 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. What items of work are specifically included in Bid Item 3007, STORMWATER MANAGEMENT CONTROL STRUCTURE FOR S.W.M. POND NO.3?
  A. "SP 305 - Miscellaneous Structures" includes provisions for payment of Stormwater Management Control Structures. This SP was revised by Addendum No. 2 to include the cost of temporary modifications for sediment basin risers as incidental to the cost of the Stormwater Management Control Structure (305.04.07).

Inq. 165 Post Date:   2/26/2003 Inquiry Date:   2/27/2003
  Q. Is there a pay item for the BIORETENTION FACILITY OUTFALL STRUCTURES, S8-1 and S8-4? Note that the special provision for the bioretention facilities does not include the outfall structures.
  A. Items 3101 and 3102 were added by Addendum No.2 for Stormwater Management Control Structures for SWM Facility No. 4 and SWM Facility No. 5 respectively. Item 3102 was subsequently deleted from the Project by Addendum No. 3

Inq. 164 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. What drawings cover the work required by Bid Items 8048 & 8049?
  A. Item 8048 will clarified by addendum Item 8049 can be found on plan sheets 769.1 to 769.5

Inq. 163 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. Where is Bid Item 3036. 72" 84" RCP CL IV used - 72LF
  A. Where is Bid Item 3036. 72" 84" RCP CL IV used - 72LF

Inq. 162 Post Date:   2/26/2003 Inquiry Date:   2/27/2003
  Q. The following pipe quantities do not appear to be correct: 12"RCP I 19- 10B to E 19 - 10B 40LF I 21-2 to Tie-in ext. 19.00 59.00LF 18" Per Pipe Schedule 9081.10 24" Per Pipe Schedule 11595.07 27" M-1 24-1B to I 24-7 20LF (Per Pipe Schedule) 30" Per Pipe Schedule & 1237.02LF RR installation? 36"RCP Per Pipe Schedule 309.00LF 42"RCP Per Pipe Schedule 787.00LF 72:RCP Per Pipe Schedule 247.94LF 27"X43"RCP Per Pipe Schedule 30LF
  A. These quantities will be revised by Addendum No. 4 A new item will be added by Addendum No. 4 for 42 Inch RCP, Class V. The Pipe Schedule will be revised by Addendum No. 4

Inq. 161 Post Date:   2/26/2003 Inquiry Date:   2/27/2003
  Q. Pipe Schedule on Page 186 of 777 - You have 2 entries for 1-813 to EW-8-6 (18") 98.20 LF 1-8-13 to EW-8-6 (24") 88.71 LF Which entry is correct?
  A. I-8-13 to EW-8-6 (24") 88.71 LF is correct. I-813 to EW-8-6 (18") 98.20 LF will be revised in Addendum 4.

Inq. 160 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. Item 8084 calls for 30' light pole w/10' arms. Where are the luminaries on the bid schedule?
  A. A. This item will be addressed by addendum

Inq. 159 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. If they are to be cablecon, what is the procedure when the plans call for multiple (more than 2) wires? The bid items (8112-8114) only call for 2 or 4 wires. Are we to pull additional wires through the duct or are we to bury more than one pipe?
  A. See answer to previous question

Inq. 158 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. Are the conduits for the parking lot lighting system (print #62) and the street lighting system (print #s 716-717) to be cablecon or PVC?
  A. A. Conduit to be installed for the roadway lighting shall be Schedule 80, Polyvinyl Chloride Electrical Conduit

Inq. 157 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. Are any of the electrical conduits to be concrete encased?
  A. A. See sheet no. 316.30, note 16

Inq. 156 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. Item 8054 states "Lighting System". What area does this refer to?
  A. The new lighting for the yard as shown on Sheet No. 316.30 and addressed in the Specifications that were added in Addendum 3.

Inq. 155 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. Item 8051 states "Duct bank, Conduit & Wire". What area does this refer to?
  A. A. Addressed in Addendum 4

Inq. 154 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. There is no discussion of the WMS in the proposal other than that on pages 46 thru 47 of the project description. There is no discussion of measurement and payment for the WMS. Should there be a special provision dealing with the WMS and does the proposal include all the appropriate items needed to pay for this work? Questions 2, 3 and 4 indicate they are not included in the proposal quantities.
  A. A. R. The Special Provision for the WMS site will be part of Addendum 4

Inq. 153 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. There are no permanent stabilization measures detailed on the WMS plans.
  A. Sheet WM 3, Note #4 the plans state that following placement of furnished and salvaged topsoil, all areas within the LOD are to be seeded with SHA temporary seed mix. This mix will serve as the permanent stabilization in addition to the seed material within the salvaged topsoil.

Inq. 152 Post Date:   2/26/2003 Inquiry Date:   
  Q. Our take-off of super silt fence for the project is 21,084 feet and the proposal quantity is 16,599 feet. There is 4500 +/-, feet of super silt fence in the WMS. Was this quantity left out?
  A. A. This item will be corrected by addendum

Inq. 151 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. Our take off indicates a balanced site if salvaged topsoil is used to place the 15,000 cubic yards of furnished topsoil - - 12" deep that is indicated from page 96 of the proposal typical section, WM Sheet 5 of 8, and proposal Item 7086. If there is excess topsoil in the mitigation site that could be used for grading adjustment, how are you paid for it? Should there be an item for placing salvaged topsoil for grading adjustment per cubic yard?
  A. No soil removed from the mitigation site is to be used for grading adjustments on the mitigation site. Only Furnished topsoil and Salvaged topsoil from the station locations indicated in the Special Provision will be used in the mitigation site.

Inq. 150 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. The typical section for this Wetland Mitigation Site (WMS), WM sheet 5 of 8, indicated that salvaged topsoil is only placed on top of areas where furnished topsoil is placed. Is that detail correct? Placing salvaged topsoil on top of furnished topsoil does not seem logical. Should the salvaged topsoil to on areas where no furnished topsoil is placed?
  A. The salvaged topsoil serves as a seed bank. It will be placed on top of Furnished topsoil as well as other areas within the LOD.

Inq. 149 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. If the above items 8051, 8052, 8054 & 8055 are intended for the Rail Yard, only drawing 316.30 gives limited information. There is no item scope in the proposal for above items and no electric riser or specifications for fixtures, panelboards, plug stands etc. Example 1: No specification and where are the three 4'x4'x5' manholes in the rail yard paid for?
  A. Will be addressed in Addendum 4

Inq. 148 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. Item 8054 - Lighting System? What area does this refer to?
  A. a. The new lighting for the yard as shown on Sheet No. 316.30 and addressed in the Specifications that were added in Addendum 3.

Inq. 147 Post Date:   2/26/2003 Inquiry Date:   2/26/2003
  Q. Item 8099 - 4" multi-duct -What location and drawing?
  A. This item will be revised by addendum

Inq. 146 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. 3. On Plan Sheet 155+156 is Structure S-17-2, which is a Type C Endwall for 18" pipe, Item 3039. Does this Structure require the Intregral Color Concrete?
  A. S-17-2 is a SWM Riser as per the Structure Schedule on Sheet 190. Yes, Note 1 of the Riser Details on Sheet 156 indicates that integral color will be used.

Inq. 145 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Do any Structures on plan sheets 162 thru 164 require Integral Color Concrete?
  A. No, these structures do not require Integral Color

Inq. 144 Post Date:   2/19/2003 Inquiry Date:   
  Q. Q. How is Structure S-8-2 on plan sheet 163 paid for?
  A. A pay item will be established by Addendum 4 for Modified B-72 Headwall

Inq. 143 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Starting on page 34 of 777 and continuing on other pages make reference to pages 644-654 for Waterline Details, pages 644 to 546 reference S9 - Bridge #3374 & S10 Retaining Wall
  A. Will be addressed by Addendum

Inq. 142 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Plan Sheets 32 of 777, 33 of 777, 35 of 777, make reference to Removal of Buildings - There is no 102 Item for Removal of Buildings?
  A. Will be addressed by Addendum

Inq. 141 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. 2. On Drawing 316.28/316.27 what is the drawing of the existing water main WL2 are tying into?
  A. The proposed waterline is tying into the existing water line that runs parallel to the existing building on the east side.

Inq. 140 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Ref Drawing 316.24 Inspection Pit Detail 1) Does the Non-Step end of Pit get the 1 ½" OD Steel Posts shown in Section B-B 2) Detail 2 at bottom of page 316.24 calls for 1 ½" Steel Railing - What is the detail of Step Railing?
  A. This will be clarified by addendum

Inq. 139 Post Date:   1/15/2003 Inquiry Date:   1/15/2003
  Q. Is there a pay item for the proposed concrete raised median at abutment referenced on plan sheet 473
  A. There is not a pay item for the raised median at abutment for Bridge S6. Payment for this item will be clarified by addendum

Inq. 138 Post Date:   1/15/2003 Inquiry Date:   1/15/2003
  Q. Is there a pay item for the proposed concrete pad referenced on plan sheet 316.12?
  A. These items will be addressed by addendum

Inq. 137 Post Date:   1/15/2003 Inquiry Date:   1/15/2003
  Q. Do the contractors have to provide a railroad protective liability policy for the Maryland Transit Administration for the MARC trains?
  A. This is addressed in Addendum 4

Inq. 136 Post Date:   1/15/2003 Inquiry Date:   1/15/2003
  Q. Do the contractors have to provide a separate railroad protective liability policies for each railroad?
  A. Separate policies are needed for each property owner (CSX and Amtrak).

Inq. 135 Post Date:   1/15/2003 Inquiry Date:   1/15/2003
  Q. The bid item numbers for aggregate amounts on page 487 of the SCHEDULE OF PRICES appears to be incorrect.
  A. This page will be reviewed and if there is an error, it will be corrected by addendum

Inq. 134 Post Date:   1/22/2003 Inquiry Date:   2/24/2003
  Q. Referencing specification section 881 - Railroad. There are specific requirements for railroad protective liability insurance listed for both Amtrak and CSX Transportation, Inc. but nothing listed for MARC train. Is a separate policy required or do they piggyback Amtrak? Please clarify.
  A. This is addressed in Addendum 4

Inq. 133 Post Date:   2/19/2003 Inquiry Date:   2/24/2003
  Q. Referencing page 487D of the Schedule of Prices states under Alternate B : 6034-6067 as part of the inclusive item numbers, however the 6000 series only goes to number 6037. Please clarify?
  A. This is addressed in Addendum 4

Inq. 132 Post Date:   2/25/2003 Inquiry Date:   2/25/2003
  Q. Ref Drawing 252 of 777 under note No. 2 says see wetland grading special provision - Where is that section found? How is this excavation paid for?
  A. Will be addressed in Addendum 4

Inq. 131 Post Date:   2/25/2003 Inquiry Date:   2/24/2003
  Q. How and where are the limits of clearing and grubbing designated on the drawings - would that be to the limits of disturbance?
  A. Yes. Also see last paragraph on page 184 of the Standard Specifications for Construction and Materials, January, 2001.

Inq. 130 Post Date:   2/25/2003 Inquiry Date:   2/25/2003
  Q. How is earthwork for the railroad track construction paid for (under which bid item)?
  A. The earthwork is paid for under item 201032. Class 2 Excavation.

Inq. 129 Post Date:   2/25/2003 Inquiry Date:   2/24/2003
  Q. Reference is made to page 313 of the specs Railroad Construction Materials Inspection - What does this breakdown into a daily rate?
  A. As specified in the specification, all costs shall be the responsibility of the contractor and all rates shall be in accordance with the Maryland State Department of Transportation regulations.

Inq. 128 Post Date:   2/25/2003 Inquiry Date:   2/24/2003
  Q. There still are several questions that we have sent in that remain unanswered, that is the status of these questions?
  A. Inquiries from 1-23, 1-28, 2-6 and 2-7 have been posted. The only inquiries from Wagman that have not been posted are those sent received on 2-19-03.

Inq. 127 Post Date:   2/25/2003 Inquiry Date:   2/25/2003
  Q. Bid item 7050 is for "Median Planting". There is no special provision for this bid item and we can't find any reference to this item in the contract drawings. What is this item for; please clarify.
  A. This item is revised in Addendum No. 4

Inq. 126 Post Date:   2/25/2003 Inquiry Date:   2/24/2003
  Q. Plan sheet 45 of 777 shows an existing BGE power line that runs parallel and to the east of the existing amtrak tacks. This line runs just to the east of pier 2 for 59 and adjacent to the new MTA/Marc storage tracks that extend back under new bridge 59. This line appears to be in conflict with constructing pier 2 for 59.
  A. What happens to this power line in the vicinity of pier 2; is it relocated underground? There is an "E-Duct" shown in this same vicinity; is this an existing electric duct or is this designation showing the relocated power line to an underground location? There appears to be no test pit info. if this is an existing electric duct. If this line is going to be relocated; when will this occur? Please clarify. This utility relocation work is to be done concurrent with contract as specified in the Utility Statement on page 285 of Invitation for Bids book.

Inq. 125 Post Date:   2/25/2003 Inquiry Date:   2/24/2003
  Q. In reference to Bid Items 7083, PLACING SALVAGED TOPSOIL FOR GRADING ADJUSTMENT, at 2,000 CY and 7086, PLACING FURNISHED TOPSOIL FOR GRADING ADJUSTMENT, at 15,000 SY, can you please provide information on where the topsoil is to be placed? Are these items for the topsoil in the wetland mitigation ponds?
  A. The 15,000 S.Y. of furnished topsoil for grading adjustments will be placed within the graded portions of the wetland mitigation site or ponds as the contract refers to them.

Inq. 124 Post Date:   2/25/2003 Inquiry Date:   2/24/2003
  Q. In reference to Bid Items 7085, PLACING SALVAGED TOPSOIL 4" DEPTH, at 95,390 SY and 7087, PLACING FURNISHED TOPSOIL, at 162,520 SY, I haven't been able to locate where this 4" depth topsoil is required. Can you please provide the information on where the 4" depth topsoil is to be placed? Also note that the Typical Sections indicate to place 2" depth topsoil on all roadside areas 2:1 and flatter.
  A. The quantities are to be placed on all roadside and median areas. The typical sections will be revised by addendum.

Inq. 123 Post Date:   2/25/2003 Inquiry Date:   2/24/2003
  Q. What items of work are specifically included in Bid Item 3007, STORMWATER MANAGEMENT CONTROL STRUCTURE FOR S.W.M. POND NO.3?
  A. "SP 305 - Miscellaneous Structures" includes provisions for payment of Stormwater Management Control Structures. This SP was revised by Addendum No. 2 to include the cost of temporary modifications for sediment basin risers as incidental to the cost of the Stormwater Management Control Structure (305.04.07).

Inq. 122 Post Date:   2/25/2003 Inquiry Date:   2/25/2003
  Q. Is there a pay item for the BIORETENTION FACILITY OUTFALL STRUCTURES, S8-1 and S8-4? Note that the special provision for the bioretention facilities does not include the outfall structures.
  A. Items 3101 and 3102 were added by Addendum No.2 for Stormwater Management Control Structures for SWM Facility No. 4 and SWM Facility No. 5 respectively. Item 3102 was subsequently deleted from the Project by Addendum No. 3.

Inq. 121 Post Date:   2/24/2003 Inquiry Date:   2/24/2003
  Q. Referencing addendum #3, the description of changes for item #4041 states the quantity changed to 7,654, however the schedule of prices sheet 411 for item #4041 lists the quantity at 7,645. Please clarify which is the correct quantity?
  A. This will be addressed in addendum 4.

Inq. 120 Post Date:   2/24/2003 Inquiry Date:   2/24/2003
  Q. Are the answers on the inquiries page to be considered contract documents? If so, shouldn't they be issued as an addenda to insure that everyone bids on the same document?
  A. As stated in the contract documents, any responses to questions or inquiries having any material effect on the bids will be addressed by written addenda sent to all prospective bidders. All answers to contractor questions on this web site are for informational purposes only.

Inq. 119 Post Date:   2/24/2003 Inquiry Date:   2/24/2003
  Q. We have sent over 30 inquiries (RFI's) and most of them have not been answered to date. Is SHA going to answer all of the RFI's that it receives in a timely manner?
  A. SHA will address all comments and questions as soon as possible. Because questions vary in complexity and some require responses from parties outside of SHA, there is a variable time response associated with each inquiry. We apologize for any delay in publishing responses and will continue to strive to improve in this area.

Inq. 118 Post Date:   2/24/2003 Inquiry Date:   2/24/2003
  Q. What type of earth dike is D-47-1, Sheet ED 47?
  A. Earth dikes ED 15-5 and ED 47-1 are type A-2. The "A-2" label will be added by a pen and ink change with Addendum 4 on Sheets EP-15, EP-38, EP-47, and EP-48.

Inq. 117 Post Date:   3/28/2003 Inquiry Date:   3/15/2003
  Q. What is the location where bid item 5001 is utilized?
  A. The note on sheet 98 regarding the temporary pavement for Ramp A refers to the pavement detail titled "Temporary Road for MD 43 and US 40", which utilizes this item.

Inq. 116 Post Date:   2/24/2003 Inquiry Date:   2/18/2003
  Q. The grading table calls for 9,500 cubic yards of Class 2 Excavation. The plans say that excavation for clay core trench is also Class 2 excavation. If 2/3 of the 6,000 cubic yard clay quantity (4,000 cubic yards) has to be excavated then the total class 2 required would be 13,500 cubic yards. The proposal quantity for Alternates A and B is 24,974 cubic yards. Where is the remaining 11,500 + or minus cubic yards used?
  A. The quantity on the grading table does not include any excavation for the track relocation. The quantity for Class 2 Excavation in the Schedule of Prices does.

Inq. 115 Post Date:   2/24/2003 Inquiry Date:   2/24/2003
  Q. There is approximately 5,000 cubic yards of excavation in the railroad yard. How is this excavation to be paid for?
  A. Excavation for the Rail Yard is included in the estimate. See Line Number 2005, Item Number 201032.

Inq. 114 Post Date:   2/24/2003 Inquiry Date:   2/18/2003
  Q. The grading table does not include any information about the excavation at the Wetland Mitigation Site. Is this excavation to be considered Class 1 Excavation? If this is the case then it would add approximately 36,000 cubic yards to the Class 1 total.
  A. The quantity on the grading table does not include any excavation for the wetland mitigation site. The quantity for Class 1 Excavation in the Schedule of Prices does.

Inq. 113 Post Date:   2/24/2003 Inquiry Date:   2/18/2003
  Q. The grading summary for Alternate A shows a quantity of 527,500 cubic yards of Class 1 Excavation and the proposal quantity calls for a total of 592,892 cubic yards. Where are the remaining 65,392 cubic yards?
  A. The quantity on the grading table does not include any excavation for the wetland mitigation site. The quantity for Class 1 Excavation in the Schedule of Prices does.

Inq. 112 Post Date:   2/24/2003 Inquiry Date:   2/24/2003
  Q. The plans only contain a grading table and summary of earthwork for the concrete paving section Alternate A. Where is the grading table and summary of earthwork for the HMA paving section Alternate B?
  A. As stated on page 174A, section C, in the Invitation for Bids, Alternate B earthwork quantities are not noted in the grading table or cross sections. The schedule of prices does contain the earthwork quantities needed for Alternate B.

Inq. 111 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Explain summary of dirt quantities, they don't match the cross sections.
  A. The earthwork quantities on the cross sections represent areas are measured in square feet. The quantities listed in the Grading Table (Summary of Earthwork) represent volumes and are measured in cubic yards. Please clarify question.

Inq. 110 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Page Revisions - when you replaced page 49, you deleted the (continued) right of way status, and permit status.
  A. Addressed in Addendum 3.

Inq. 109 Post Date:   2/19/2003 Inquiry Date:   2/18/2003
  Q. Item 3001 - Bioretention Facility; with so many items included in this square, yard price, what happens if we need to go lower in depth or add more underdrain?
  A. These facilities need to be constructed according to the (MDE) approved plan. Bid it as it is shown.

Inq. 108 Post Date:   2/19/2003 Inquiry Date:   2/18/2003
  Q. Addendum #2 - Schedule of Prices; Did you mean to delete item 7080?
  A. Yes, this revision is correct.

Inq. 107 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Item 6008 - Truncated Domes: Measurement and payments.
  A. The item description on page 210 will be revised as an Addendum.

Inq. 106 Post Date:   2/19/2003 Inquiry Date:   2/18/2003
  Q. There are buildings without numbers at center line 386+50 and right 401+0.
  A. These buildings are not numbered because they will be raised prior to Notice to Proceed.

Inq. 105 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Detail for Reinforced Concrete arch over 36" water line. Drawing #2001-2383 sheet 10 of 11 water.
  A. We have eliminated the use of the reinforced concrete arch. We are now using a steel sleeve and the plans have been changed as a part of Addendum 2.

Inq. 104 Post Date:   2/19/2003 Inquiry Date:   2/18/2003
  Q. Sub section 878.04.01 - Measurement and payment - underground electrical duct bank. Duct bank not shown on drawings and there is no item in the Schedule of Prices.
  A. Will be addressed by addendum.

Inq. 103 Post Date:   2/19/2003 Inquiry Date:   2/18/2003
  Q. Contract Proposal Book - Section 878 - Electrical information: Sub section 878.01 - Description - Underground concrete encased electrical duct bank from abutments to manholes.
  A. Will be addressed by addendum.

Inq. 102 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Item 8055 - Panel board System?
  A. Addressed in Addendum 3.

Inq. 101 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Item 8054 - Lighting system?
  A. Addressed in Addendum 3.

Inq. 100 Post Date:   2/19/2003 Inquiry Date:   2/18/2003
  Q. Item 8052 - Electric plug stands?
  A. Addressed in Addendum 3.

Inq. 99 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Item 8051 - Duct bank conduit & wire?
  A. Will be addressed by addendum.

Inq. 98 Post Date:   2/19/2003 Inquiry Date:   2/18/2003
  Q. Item 8099 - 4" multi duct -What location and drawing?
  A. Will be addressed by addendum.

Inq. 97 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. 24" water from station 518+00 to 24" valve should be restrained but not shown.
  A. Addressed in Addendum 2.

Inq. 96 Post Date:   2/19/2003 Inquiry Date:   2/18/2003
  Q. Profile & type of joint on 12" and 16" stubs.
  A. As a part of Addendum 2, we have provided a cut box for these stubs as well as a note requiring them to be restrained joints.

Inq. 95 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Bid items 8048 and 8057 need measurement and payment.
  A. Addressed in Addendum 3

Inq. 94 Post Date:   2/19/2003 Inquiry Date:   2/18/2003
  Q. Need specifications on 48" steel sleeve with 24" water main.
  A. Addressed in Addendum 2.

Inq. 93 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Need bury elevations on hydrants.
  A. It has been our policy not to put "bury" depths on hydrants. There is sufficient information on the plans to figure this out.

Inq. 92 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Do 36" tie-ins need to be done at night?
  A. Yes, there is a note in the special provisions stating that ALL tie-ins must be done at night and on the weekend. The special provisions were added as a part of Addendum #2.

Inq. 91 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. Need detail for installing 36" water in 72" sleeve.
  A. Addressed in Addendum 2.

Inq. 90 Post Date:   2/19/2003 Inquiry Date:   2/19/2003
  Q. 72" Sleeve - 1 place calls for steel and 2 places call for RCP. If RCP, what class due to 40' fill over it?
  A. Addressed in Addendum 2.

Inq. 89 Post Date:   2/18/2003 Inquiry Date:   2/18/2003
  Q. Bridge Standard BR-SS (6.30)-88-195 Additional Longitudinal Reinforcement in Top of Continuous Deck Slabs over Piers is provided on Contract Plan Sheet No. 635. The chart included with this standard does not indicate that any additional reinforcement is required over the piers for Bridge Structure S-9. Is the contractor correct in assuming that no additional longitudinal reinforcing steel is required over any of the bridge piers?
  A. This chart has been filled in and is being issued in Addendum No. 3.

Inq. 88 Post Date:   2/18/2003 Inquiry Date:   2/18/2003
  Q. Referencing Contract Plan Sheet No. 542, Sequence of Construction Note No. 8 states that, "The Contractor shall maintain at least 20' clearance behind the bank wall for all cranes when setting beams in place." Please clarify the location of the bank wall. Is it the Owner's intent that all portions of the cranes used for erecting the precast beams must be a minimum of 20' clear of the back of the new abutment backwall?
  A. In Sequence of Construction Note No. 8 "bank wall" is misspelled. It should be "back wall". This pen and ink change will be addressed by addendum.

Inq. 87 Post Date:   2/18/2003 Inquiry Date:   2/18/2003
  Q. We have reviewed the following items and request the item quantities be checked as we feel in our opinion that quantities are as much as 20% off. 5005, 5009, 5013, 5017, 5018 and 5022.
  A. These items have been reviewed and will remain as stated in the Schedule of Prices.

Inq. 86 Post Date:   2/18/2003 Inquiry Date:   2/18/2003
  Q. Per Addendum #2 Item No. 5013 (504462) "Hot Mix Asphalt Superpave 37.5MM for Base PG64-22 Level 3 for Alternate B -Hot Mix Asphalt Pavement" was increased from 82,268 Tons to 94,368 Tons. Can the SHA provide direction as to specifically why this quantity was increased? For example, was there a section of the plans not included in the original quantity and if so what section?
  A. This item was increased because of a miscalculated quantity.

Inq. 85 Post Date:   2/18/2003 Inquiry Date:   2/18/2003
  Q. P. Flanigan & Sons, Inc is here by requesting that the SHA review the Concrete Curb and Gutter Pay items. It is our belief that an item has been omitted from the pay schedule for Alternate A Concrete Pavement. We believe there should be an item for Curb and Gutter TYA 12" Gutter 12" Depth Alternate A Concrete Paving with an aprox. Quantity of 64,508'. We feel it is important to give this issue immediate attention in order to ensure the bids for Alternate A and Alternate B are evaluated equally.
  A. This item 6005 is in the Schedule of Prices.

Inq. 84 Post Date:   2/18/2003 Inquiry Date:   2/18/2003
  Q. At the top left hand corner of plan sheet 13 are the partial depth and full depth notation on partials reversed?
  A. This will be addressed by addendum.

Inq. 83 Post Date:   2/18/2003 Inquiry Date:   2/18/2003
  Q. Reference to bid item 5010 full depth patch - which specific detail on plan sheet 13 of 77 does it reference to? The concrete shown is some details vary from 9" to 15" deep.
  A. Item 5010 - HMA Superpave 19.0mm for full depth patch, PG 64-22, Level-4 is listed in the Pavement Legend on sheet 13 of 777 as item "9". This item is used in several pavement details, as shown with a "9" callout.

Inq. 82 Post Date:   2/18/2003 Inquiry Date:   2/18/2003
  Q. What are the rates for semi-skilled and skilled laborers?
  A. There is no semi-skilled classification. There are rates for unskilled laborers and skilled laborers. The skilled labor rates are separated by discipline.

Inq. 81 Post Date:   2/18/2003 Inquiry Date:   2/18/2003
  Q. Referencing specification pages 29 and 30 predetermined wage rates. Please clarify which set of rates apply for power equipment operators?
  A. Rates apply to the specific types of power equipment used

Inq. 80 Post Date:   2/18/2003 Inquiry Date:   2/18/2003
  Q. Referencing pages 29 and 30 of the special provisions General Decision MD020011 dated 11/15/02. Under the description highway construction projects it excludes railroad construction. Please clarify which rates are supposed to be used for the track work on this project?
  A. The highway wage rates shall be used for all laborer classifications on this project. Because the track work on this project is incidental to the highway work and is not substantial in relation to the total project costs, separate wage rates are not required for this work.

Inq. 79 Post Date:   2/18/2003 Inquiry Date:   2/11/2003
  Q. ITEM 4028- DOES THE ALUMINUM BRIDGE EXTEND 2' PAST THE LAST POST AS THE DETAILS SHOW OR DOES THE FENCE COME UP TO THE LAST POST AS SHOWN ON THE BRIDGE ELEVATION?
  A. The limits of the fencing etc has been addressed in Addendum No. 3.

Inq. 78 Post Date:   2/18/2003 Inquiry Date:   2/11/2003
  Q. ITEM 4005- I CANNOT FIND THE TYPE OR SCHEDULE FOR THE 6" PVC CONDUIT UNDER THE BRIDGE. ALSO, WE NEED THE REQUIRED SPACING FOR THE CONDUIT EXPANSION JOINTS.
  A. Note 2 on sheet S9 - 28of 52 refers to Section 878 of the Special provisions. The SP spells out clearly all material requirements as well as expansion joint details. In addition, sheet S9 - 24 of 52 girder elevation defines the location of the expansion joints.

Inq. 77 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. MD 43 over Amtrak Steel Girder Bridge #0337400 : The abutments show expansions joints but table does not show what size compression seal or retainer angle. What sizes are they?
  A. This information is included in Addendum No. 3.

Inq. 76 Post Date:   2/13/2003 Inquiry Date:   2/13/2003
  Q. BRIDGES: S-6, S-7, S-8 & S-9 : Q. Are these items (slabs on grade) part of the roadway items. These slabs are adjacent to the bridge wingwalls.
  A. The 10 ft. Hiker/Biker Trail and 5 ft. sidewalk adjacent to the bridge wingwalls are part of the roadway items.

Inq. 75 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. For Bridge S-7; details of wing walls & bridge deck show 1" on center cast in place anchor bolts for future noisewall (no spacing shown). Please provide required spacing.
  A. This information is provided in Addendum No. 3.

Inq. 74 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. On structure #9, schedule for additional reinforced over piers is not filled in. Are we to assume that additional reinforced is not required in this superstructure?
  A. This chart has been filled in as part of Addendum No. 3.

Inq. 73 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. Structure #6 and # 9 have sidewalks and medians on bridge deck. Should there be separate item numbers for these?
  A. Items for Concrete for Sidewalks and Raised Median were added for both structures in Addendum No. 3.

Inq. 72 Post Date:   2/13/2003 Inquiry Date:   2/13/2003
  Q. Where is the excavation for the wetland mitigation areas to be paid?
  A. This will be addressed by addendum

Inq. 71 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. Can a lightweight profilograph apparatus be used for this project as long as it meets all of the required criteria for testing in MSMT 559?
  A. The project ride specification (SP 535) allows the use of the California-type profilograph measuring profile index (following MSMT 559) or a dynamic/inertial profiler measuring International Roughness Index (following MSMT 563.) If a lightweight dynamic/inertial profiler is used to measure ride it must conform to MSMT 563 and International Roughness Index will be the ride index used for acceptance and pay on the project.

Inq. 70 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. Q. Item No. 5021, 12" Plan Portland Cement Concrete Pavement has a bid quantity of 140,583 SY. However our take-off for this item is approximately 116,300 SY. According to the detail on sheet 13, stations for the concrete pavement run from 363+00 to 535+50 (17,250 LF). Bridges & approach slabs through this section of roadway total approximately 845 LF. Approximately 7,700 LF of this roadway (45%) has no acceleration, deceleration or turning lanes. Since there is such a significant difference could the quantity for this item be checked? Math work: 16,405 LF x 50' width pavement = 91,139 SY 12,900 LF x 11' width (accel/decel lanes) = 15,767 SY Entrances/Left turn Lanes/median = 9,394 SY
  A. Quantity was revised in Addendum No. 3

Inq. 69 Post Date:   2/13/2003 Inquiry Date:   2/13/2003
  Q. The Maryland Standard Specifications, Section 520.03.05, states that slip form paving shall have a minimum width of 24'. Will 11' wide slip form paving for the accel/decel & turning lanes be permitted on the project?
  A. Yes, acceleration, deceleration, and turning lanes will be permitted to be paved at less than the 24' width with a slip form paver.

Inq. 68 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. Page 2-51 of 112 for the schedule of prices includes an item for Hot Mix Asphalt Superpave 19.0MM For Base PG64-28, Level 1. However, plan sheet 13 of 177 indicates all 19.0MM mixes to be PG64-22. Which is correct?
  A. This will be addressed by addendum

Inq. 67 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. Item No. 7050 - 463 each of Median Planting: Please direct us accordingly on what this bid item includes, and where reference to it can be found in the project special provisions and/or project plans
  A. This item will be revised by addendum

Inq. 66 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. Referencing line item 6004 please clarify what 3.5' x 20' is referring to?
  A. Line item 6004 does not refer to an item 3.5' x 20'. Please clarify question.

Inq. 65 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. Are we to use MD SHA chain link specifications for items 6028 through 6033? Is the 8' high chain link for a staging area? Drawings do not show where the 8' chain link is to be placed.
  A. Addressed in Addendum 3

Inq. 64 Post Date:   2/13/2003 Inquiry Date:   2/13/2003
  Q. Referencing line items 6001, 6003, and 6004 which list 3.5' black vinyl chain link, however the drawings show 3' high green vinyl. Please clarify which is the true height and color? Is the majority of this fence for the SWM ponds?
  A. This will be addressed by addendum

Inq. 63 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. Contract Plan Sheet No. 604, Section A-A refers to Bridge standard No. BR-SS (7.18)-97-321. This referenced Standard is for Finger Joints. If Finger Joints are required for Bridge S-9, the appropriate details including the required joint opening (seal) widths at each location need to be provided. On similar MD SHA projects that require Finger Joints a separate pay item is usually established for the Finger Joints on the Contract Schedule of Values. If finger Joints are not required at Bridge S-9, the appropriate details including the required joint opening (seal) widths at each abutment need to be provided.
  A. This reference note will be clarified by Addendum

Inq. 62 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. Referencing structure schedule DS-7. Structure #EW20-1 is listed as a 10' COG but is shown as a type C endwall on plan and profile. Please clarify?
  A. The structure schedule on sheet 191 will be revised by Addendum

Inq. 61 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. Referencing structure schedule DS-7. Structure #120-3 is listed as a 10' COG located on plans sheet PS-20, although no structure 120-3 is shown on that plan sheet. Please clarify?
  A. I-20-3 is renamed I-19-19 (Sta 235+84, 59.9' Lt.). The Structure Schedule on sheet 191 will be revised by Addendum

Inq. 60 Post Date:   2/13/2003 Inquiry Date:   2/13/2003
  Q. Item 4108- The quantity is double the amount shown on the contract drawing.
  A. The quantity is revised in Addendum No. 3.

Inq. 59 Post Date:   2/13/2003 Inquiry Date:   2/11/2003
  Q. 1. Drawing S9-44 has compression seal joint details where foam seals are specified. Also the seal sizes are not shown.
  A. This information is included in Addendum No. 3.

Inq. 58 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. THERE ARE NUMEROUS BID ITEMS IN THE 8000 SERIES FOR WORK INVOLVING WATER AND SEWER INSTALLATION AND RELOCATION. HOWEVER, THERE ARE TWO ITEMS, 8048 AND 8057, THAT ARE FOR "BALT. CO. SEWER RELOCATION LUMP SUM" AND "WATER DISTRIBUTION SYSTEM LUMP SUM". ARE THE INDIVIDUAL ITEMS TO BE COMPLETED OR ARE THE LUMP SUM ITEMS TO BE USED FOR THE WATER AND SEWER WORK?
  A. These items will be addressed by addendum

Inq. 57 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. Per Legend at the bottom of plan sheet 29 of 777 the BGE access road north shows as graded aggregate. Per detail shown at bottom right of plan sheet 13 of 777 BGE access road is paved - which is correct.
  A. The only BG&E Access Road that will be asphalt is the access road to the BG&E substation from Bird River Road.

Inq. 56 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. Can riser structures for the storm water management ponds be precast structures?
  A. Our policy is to accept precast structures if the precast structure meets the requirements of the Contract Documents (see 305.03.03).

Inq. 55 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. On drawing 148 (SW-23) on the anti seep column what does the 7'-6" management indicate? Is the anti seep column 8'0" x 7'-6" or 8'.04 x 6.6?
  A. The anti-seep collar detail on sheet 148 was revised by Addendum No. 2

Inq. 54 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. Detail for storm water management pond S on sheet 133 (SW-08) sys for bioretention details - See sheet SW-07 which shows 6" pipe underdrain -Does pond S get 6" underdrain or not?
  A. Sheets SW-06, SW-07, SW-08, and SW-09 will be revised by Addendum No. 3

Inq. 53 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. Which are the bid items for concrete specs and AASHTO M-43 No. 2 stone mentioned on spec 100 in the pricing proposal.
  A. Review Measurement and Payment for the Surface Sand Filter

Inq. 52 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. On Page 87 of the specs the area of muck 12X excavation is shown - How is the muck excavation paid for - which item is the select borrow back fill paid for?
  A. This will be addressed by Addendum.

Inq. 51 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. Is there a cellular phone requirement on this project (Sec. Page 77 of this specs.). Same question on digital camera (see Page 82).
  A. Will be addressed in Addendum 3

Inq. 50 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. Is there a breakdown on the 20% DBE requirement on this project?
  A. There is no breakdown for Federal Projects

Inq. 49 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. Can we assume that coping steel is not epoxy coated since they only specify epoxy coated steel for barrier and moment slab?
  A. Yes, it is not epoxy coated.

Inq. 48 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. It looks like the engineer extended the dotted line from the FGRF at the coping (which is 6" below the top of coping) over to the barrier side of the transition. However, if you scale the barrier height and look at section A-A, it seems that the elevation notes at the barrier are to FGRF even though they call out the finish grade rear face line below these elevations. Please clarify?
  A. This issue will be clarified in Addendum No. 3.

Inq. 47 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. Referencing retaining wall S-10, are the elevation notes shown at the parapet locations (from Sta 534+01.77 to 532+61.02) actually elevations for the finished grade rear face (FGRF) at the parapit?
  A. This will be clarified in Addendum No. 3.

Inq. 46 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. We received Add #2 for this contract - Does page 49 of the addendum replace 49 of contract documents or pasg 50 - It apprears that addendum #2 pages have been misnumbered.
  A. This will be addressed in Addendum 3

Inq. 45 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. Ref. your bid item 3036 - 84" RCP - Your bid quantity is 72LF. Drawing 655 of 777 shows a triple run - 3x184 = 552 LF. Please clarify.
  A. This will be addressed by Addendum.

Inq. 44 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. Where will bid item 5O15 5" GAB used?
  A. This item will be removed by Addendum

Inq. 43 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. On page 59 of 777 under phase V work. Under note 4 - Why is slurry seal mentioned? Is this an option? The standard details on sheet 51 shows 2" HMA.
  A. This item is pertaining to the Parking Lot Plans. Addendum No. 2 removed reference to slurry seal in Phase V - Note 4.

Inq. 42 Post Date:   2/11/2003 Inquiry Date:   2/6/2003
  Q. The Pipe quantities on the pricing proposal & the quantity take-off sheets do not agree. Please review & clarify.
  A. Specific inquiries are needed to make clarifications. Several discrepancies were addressed by Addenda 2 & 3. Other discrepancies were addressed by other Contractor inquiries.

Inq. 41 Post Date:   2/11/2003 Inquiry Date:   2/6/2003
  Q. Where is I 20-3 found on plans sheet 46 (PS 20 or 23)?
  A. I-20-3 is renamed I-19-19 (Sta 235+84, 59.9' Lt.). The Structure Schedule will be revised by Addendum.

Inq. 40 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. For all structures on plan sheet 45-46-47 there are no top elevations shown on drawing 191 which contains structure & pipe schedules.
  A. The top elevations are shown on the pipe profiles (PP-17, PP-18, and PP-19). Vertical depths can be calculated using these elevations.

Inq. 39 Post Date:   2/11/2003 Inquiry Date:   2/6/2003
  Q. On drawing 34 at (EW/8-7) 8-8 a manhole or EW - sheet 34 shows it as a manhole yet ?? Table on sheet 186 Shows it as a 18" flarred end section.
  A. This will be addressed by Addendum.

Inq. 38 Post Date:   2/11/2003 Inquiry Date:   2/6/2003
  Q. On page 186 in the pipe schedule 9 lines up from the bottom or the page you have listed on PS08 I-8-16 to I-8-15 259.93 LF of 18" RCP - on the plan sheets there is no pipe run from I-8-15 to I-8-16 should that be I-8-15 to I-9-1?
  A. This will be addressed by Addendum

Inq. 37 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. On page 185 on pipe and drainage schedule I/3-4 is not shown (see plan sheet 29 for ??)
  A. This will be addressed by Addendum.

Inq. 36 Post Date:   2/11/2003 Inquiry Date:   2/6/2003
  Q. Must sub-contractors for BG &E work (electric & ??) be on a BG & E list? Is that list available to GC's so we know who to contract?
  A. See Utility Statement

Inq. 35 Post Date:   2/11/2003 Inquiry Date:   2/6/2003
  Q. Based on the Borings shown on drawing 672, the water lever is show at 19.6 to 23.1 which mean we will be in water table when we undercut 3' below pipes-why then would you use gab under pipes in the water table?
  A. This design has been reviewed and will remain as shown in the contract documents. The contractor is to bid the item as shown in the contract documents.

Inq. 34 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. What work is covered by bid item 8048 (proposal page 469)?
  A. This will be addressed by Addendum

Inq. 33 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. What work is covered by bid item 8057 (proposal page 471)?
  A. Will be addressed in Addendum 3.

Inq. 32 Post Date:   2/11/2003 Inquiry Date:   2/6/2003
  Q. Why doesn't the profile for 24" water main STA 518+00 to 522+50 not show restrained joints required? Same with profile FA 24" water main STA 522+20 to STA 1+00 (in Fill areas).
  A. Addressed in Addendum 2

Inq. 31 Post Date:   2/11/2003 Inquiry Date:   2/11/2003
  Q. On Drawing 766 Profile or 36" Water main in fill area shows a reinforced concrete Area sleeve on the plan section it calls for 36" water in 72" steel sleeve - Which note is correct. If it is concrete area what is the size?
  A. Addressed in Addendum 2

Inq. 30 Post Date:   2/7/2003 Inquiry Date:   2/6/2003
  Q. Plan sheet S3-7 indicates anchor bolt replacement for 2 girders on S3 @ Abut B for a total of 4 anchor bolts. Bid item 4104 anchor bolt replacement for S3 has a plan quantity of 8 ea. Is this work for anchor bolt replacement paid for per anchor bolt? Why is the bid quantity 8 ea. Please clarify.
  A. The bolt quantity is incorrect. It will be corrected in the Schedule of Prices in Addendum No. 3. The Measurement and Payment for this work will also be clarified and included in Addendum No. 3.

Inq. 29 Post Date:   2/7/2003 Inquiry Date:   2/6/2003
  Q. Plan Sheet S3-7 calls for bearing stiffner repair at 3 locations on this structure (S3). What bid item is this work paid under? Bid item 4004 retrofit beam end for S3 is the only item might be applicable. Please clarify what bid item 4004 is for.
  A. The bearing stiffener repair will be paid for under Item 4004 - Retrofit Beam End for S3. The Measurement and Payment for this work will be clarified and included in Addendum No. 3.

Inq. 28 Post Date:   2/7/2003 Inquiry Date:   2/6/2003
  Q. On Plan sheet S3-1 in the block for proposed work for structure No. 321603. It lists "Install Drainage Trough AT Abutment B" Bid item 4108 is bridge S3 has a quantity of 104 LF which is obviously more than the quantity at Abutment B only. Please clarify. Also, is a catch basin and downspout required at abutment B?
  A. The quantity for the Drainage Trough is incorrect and will be revised in Addendum No. 3. The standard details for the Drainage Trough on sheet 367 includes catch basins and downspouts, therefore they are required.

Inq. 27 Post Date:   2/7/2003 Inquiry Date:   2/6/2003
  Q. Pages 216 thru 218 is a special provision for "Item 9804-001 Seeding and Soil supplement- Seed Mix X This appears to be a Penndot Spec & Item Number. Is this applicable to this contrat and if so how is it paid for. Please Clarify.
  A. Addressed in Addendum 2

Inq. 26 Post Date:   2/7/2003 Inquiry Date:   2/6/2003
  Q. On page 214 & 215 of the proposal is a special provision for "wetland Woody Seeding" but there appears to be no bid item for this work. Bid item 7081 is for "Wetland Seed Mix 50 lbs per acre" but this does not match description for "Wetland Woody Seeding". Please clarify.
  A. Addressed in Addendum 2

Inq. 25 Post Date:   2/7/2003 Inquiry Date:   2/7/2003
  Q. Will Addendum 3 also include a slip in the Bid Opening date?
  A. No. Currently, Addendum 3, does not contain a slip in the Bid Opening date.

Inq. 24 Post Date:   2/7/2003 Inquiry Date:   2/6/2003
  Q. Ductbank not shown on drawings and there is no item in the Schedule of Prices.
  A. This will be addressed by addendum

Inq. 23 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Would you extend the bid date just one week in order to have more time to bid this project?
  A. Request to slip the bid opening date will not be accepted from individuals. Requests for slipping a bid opening date must come from the Maryland Contractors Association

Inq. 22 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. I noticed on your website that a temporary crossing structure was mentioned. What is it to be constructed of and what are the length and width of the structure? Also are there any pedestrian bridges.
  A. There are no temporary structures proposed in the contract and there are no temporary pedestrian bridges in the contract.

Inq. 21 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Referencing specification page 62 Notice to Contractors sequence of construction, please clarify which secondary county roads are not to be utilized for hauling of materials?
  A. No county roads may be used for hauling of materials.

Inq. 20 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Will all permits be approved by bid date?
  A. All permits were included in Addendum 2, except the permit from the Maryland Aviation Administration, which is expected by bid opening.

Inq. 19 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Shouldn't there be two curb items? One for "A" and one for "B" bid? (different height of curb to be used in the "A" & "B" bid -the concrete pavement bid uses smaller height curb- less c.y. concrete )
  A. SHA answer: Addressed in Addendum 2

Inq. 18 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Comment: contractor submitted that he would prefer separate bid tabs when "A" & "B" bid process is invoked--this would simplify the bid tab process- less likelihood of errors for contractor in the tabulation of bid items
  A. SHA reply: Because there were a small number of items that would be changed depending on the Alternate bid, it was decided that only one schedule of prices was needed. This will not change. If there is an item that is not part of the alternate that you are bidding on, please fill in the blank with N/A.

Inq. 17 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Bidding requirements: Alt. A & Alt. B question: Is the number $695,000.00 to be entered by contractor onto the bid document?
  A. If Contractor chooses to bid on Alternate B (Asphalt), SHA will add the adjustment factor to the contractors submitted bid. The contractor is not responsible to include the adjustment factor as part of their bid.

Inq. 16 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Requested clarification for the limited notice to proceed:
  A. purpose of limited notice to proceed is for preliminary relocation work to be performed by Amtrak forces

Inq. 15 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Safety training required for Amtrak?
  A. Yes for SHA and Contractor

Inq. 14 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Amtrak question: safety training required for Amtrak?
  A. Yes for SHA and Contractor

Inq. 13 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Amtrak question: shouldn't owner (SHA) be responsible for the working hours at the Amtrak location?
  A. Will be addressed in Addendum 3

Inq. 12 Post Date:   6/30/2003 Inquiry Date:   6/20/2003
  Q. On Bid Item 1008 Temporary Support of Excavation, can SHA be more definitive in regarding which sheeting belongs in that item?
  A. See pages 77 & 78 of the Invitation of Bids, Special Provision 100 - Temporary Support of Excavation in Median of US 29.

Inq. 11 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Why isn't IFB on the Website and will it be posted?
  A. The process of posting contracts on the web is new and SHA wanted to start with the plans only. The IFB for this project will not be posted on the website

Inq. 10 Post Date:   6/30/2003 Inquiry Date:   6/30/2003
  Q. On page 170, the architectural treatments appear to be incomplete.
  A. This specification will be revised by addendum.

Inq. 9 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. R/W status?
  A. SHA answer: All items expected to be cleared by NTP (4/28/03)

Inq. 8 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. MBE participation: 10 or 20%?
  A. SHA answer: 20 %

Inq. 7 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Comment:13 trainees seems unusually high for this contract
  A. SHA answer: This requirement will not be changed

Inq. 6 Post Date:   2/6/2003 Inquiry Date:   2/6/2003
  Q. Is the 10'0"hiker/biker trail and 5'0 sidewalk shown on section F-F on plan sheet S9-15, incidental to the parapet concrete for Bridg S9?
  A. A. The sidewalks will be paid for under the Concrete for Sidewalks and Raised Median for S9 item, which is being added in Addendum No. 3.

Inq. 5 Post Date:   6/27/2003 Inquiry Date:   6/20/2003
  Q. I represent the Keystone Keysystem Retaining Walls. Are you allowing for segmental walls (approved for MSHA, of course) on this project?
  A. Segmental Walls will not be allowed on this project.

Inq. 4 Post Date:   6/19/2003 Inquiry Date:   6/18/2003
  Q. On Sheets 272 and 273 of 504, an "optional" field splice is shown in Span 1 and a "required" field splice is shown in Span 2 for girders 1 thru 14. Would we be allowed to flip flop these splices making the "required" field splice in Span 1 and the "optional" field splice in Span 2?
  A. We designated the Span 2 splice as "required" so the Contractor would not have to disrupt traffic on US 29, in Stage 3A, under Span 1. SHA wants the splices to remain as shown on the Plans.

Inq. 3 Post Date:   6/30/2003 Inquiry Date:   6/30/2003
  Q. On page 170, the architectural treatments appear to be incomplete.
  A. This specification will be revised by addendum.

Inq. 2 Post Date:   1/27/2003 Inquiry Date:   1/27/2003
  Q. Is there a joint warranty on this project?
  A. No specific joint warranty is included in the Contract Documents, however Section 523.03.03 does include short term performance requirements.

Inq. 1 Post Date:   1/14/2003 Inquiry Date:   1/14/2003
  Q. What are the details for Item 3019 (Slope Drainage Blanket)? There is no Special Provision provising the details for this item.
  A. A Special Provision for this item will be included in Addendum 2.

CIC Home

Advertisements

Project Quantities

Contract Inquiries

Competitive Sealed Proposals

Addendum

Plan Purchasers