MD 216 Relocated between US 29 and I-95

Welcome   Background   The Project   Traffic data  Detail Build Information  Project Information

Traffic Data

Four-Lane vs. Six-Lane Traffic Projections

Our traffic forecast shows that the proposed MD 216/Crest Road intersection, striped for four lanes, will operate acceptably until the year 2020. Traffic projections have shown a heavier volume of vehicles between I-95 and Leishear Road; therefore, we find it necessary to provide a striped six-lane section in this area. We expect that the proposed MD 216/Leishear Road intersection with the six-lane configuration will operate acceptably until 2020. At or around the year 2020, it is expected that the roadway will require routine grinding and overlay. At that time, the remaining corridor can be striped for six lanes continuously, if warranted.

Traffic Data

Average Daily Traffic (ADT) is the average number of vehicles traveling a roadway during a 24-hour period. The 1997 ADT for MD 216 is 15,000 vehicles per day. The projected ADT for 2025 is 51,000 vehicles per day. Existing MD 216 was not designed to accommodate such traffic.

Level of Service (LOS) designations, A to F, are used to measure the operational capacity of intersections or capacity on a given section of roadway. LOS ‘A’ indicates free traffic flow while LOS ‘F’ indicates severe congestion and traffic delays. In 2025, the proposed intersection at MD 216 and Crest Road is expected to operate at LOS ‘C’ and LOS ‘E’ in the AM peak hour and the PM peak hour, respectively. The proposed intersection of MD 216 and Leishear Road is expected to operate at LOS ‘D’ in both the AM and PM peak hours.

Traffic Projections

Traffic volumes for MD 216 (Scaggsville Road) and the surrounding roadways within the project area are displayed in the Volume Comparison Chart and Map. There are three sets of data. Each set includes the actual traffic volume measurements that were taken during the particular year. In addition, the traffic volume that was predicted for the particular year in the future is displayed.

Volume Comparison Chart

Average Daily Traffic
A
MD 216
West of
US 29
B
US 29 from
MD 216 to
Gorman Rd.
C
 
Crest
Road
D
Existing /
Relocated
MD 216
E
 
Leishear
Road
1979 Actual Count
2006 Projections

1997 Actual Count
2020 Projections

2001 Actual Count
2025 Projections
5700
28000

9300
33000

8500
38000
22500
63250

34800
81700

40100
92600




9900

1400
1600*
5200
10300

12000
50200

17000
50500
6400
10600

12000
11250

15000
15000


* Volume significantly reduced after 1997 study due to a change in the planned road network

Project Area Map to accompany Volume Comparison Chart

Additional information is available on the Howard County Traffic Volume map (PDF, 952kb).

To view the Traffic Volume map, users need to have an 'Adobe Acrobat Reader' on the machine.

If the user experiences a difficult to view the Howard County Traffic Volume map please contact us at [email protected]

previous graphic next graphic
MDOT Home FAQ's Information Site Map Privacy Policy Contact Us Copyright & Disclaimers Help File Viewers